A platform for research: civil engineering, architecture and urbanism
Barriers to Applying the Design-build Procurement Method in Hong Kong
Despite the global use of the design-build (D&B) method to manage construction projects, there remain barriers that hinder its healthy development. This paper builds on earlier work and investigates the barriers that impede the use of the design-build procurement method in the construction industry. After a comprehensive literature survey, an empirical study was conducted in the Hong Kong construction industry by means of a questionnaire survey. The top-3 barriers to the implementation of D&B were ‘D&B contractors carry a high degree of risks and liability’, ‘The Contractor tendering for the D&B project will suffer greatly if the contract is not awarded to him’, and ‘D&B contractors do not have in-house architects and engineers’. Both intra-group and inter-group comparisons were conducted to determine the level of agreement of the D&B participants on the rating exercise. Results show that there is significant agreement among the respondents in each of the client, contractor and consultant groups, and also among all D&B participants on the rating of the problems of running D&B projects. This research provides an understanding of the barriers to the adoption to the D&B development in the Asia, despite its widespread use in other parts of the world.
Barriers to Applying the Design-build Procurement Method in Hong Kong
Despite the global use of the design-build (D&B) method to manage construction projects, there remain barriers that hinder its healthy development. This paper builds on earlier work and investigates the barriers that impede the use of the design-build procurement method in the construction industry. After a comprehensive literature survey, an empirical study was conducted in the Hong Kong construction industry by means of a questionnaire survey. The top-3 barriers to the implementation of D&B were ‘D&B contractors carry a high degree of risks and liability’, ‘The Contractor tendering for the D&B project will suffer greatly if the contract is not awarded to him’, and ‘D&B contractors do not have in-house architects and engineers’. Both intra-group and inter-group comparisons were conducted to determine the level of agreement of the D&B participants on the rating exercise. Results show that there is significant agreement among the respondents in each of the client, contractor and consultant groups, and also among all D&B participants on the rating of the problems of running D&B projects. This research provides an understanding of the barriers to the adoption to the D&B development in the Asia, despite its widespread use in other parts of the world.
Barriers to Applying the Design-build Procurement Method in Hong Kong
Lam, Edmond W. M. (author) / Chan, Albert P. C. (author) / Chan, Daniel W. M. (author)
Architectural Science Review ; 49 ; 189-195
2006-06-01
7 pages
Article (Journal)
Electronic Resource
Unknown
Barriers to Applying the Design-build Procurement Method in Hong Kong
Online Contents | 2006
|Barriers to Applying the Design-build Procurement Method in Hong Kong
British Library Online Contents | 2006
|Design and Build Procurement Method in Hong Kong - an Overview
British Library Conference Proceedings | 1997
|Development of the Design-Build Procurement System in Hong Kong
Online Contents | 2004
|Development of the Design-Build Procurement System in Hong Kong
British Library Online Contents | 2004
|