A platform for research: civil engineering, architecture and urbanism
A genetic-algorithm-based resource-constrained construction scheduling system
Resources for construction activities are limited in the real construction world. To avoid waste and shortage of resources on a construction jobsite, scheduling must include resource allocation. A new resourceconstrained construction scheduling system is proposed in this paper. A GA-based searching technique is adopted in the system. In this paper, new GA crossover and mutation operators, UX3 and UM3, are presented. These new operators overcome the drawback of traditional GA operators for sequencing problems. The system effectively can provide the optimal combination of construction duration, resource quantities and minimum project duration under the constraint of limited resources.
A genetic-algorithm-based resource-constrained construction scheduling system
Resources for construction activities are limited in the real construction world. To avoid waste and shortage of resources on a construction jobsite, scheduling must include resource allocation. A new resourceconstrained construction scheduling system is proposed in this paper. A GA-based searching technique is adopted in the system. In this paper, new GA crossover and mutation operators, UX3 and UM3, are presented. These new operators overcome the drawback of traditional GA operators for sequencing problems. The system effectively can provide the optimal combination of construction duration, resource quantities and minimum project duration under the constraint of limited resources.
A genetic-algorithm-based resource-constrained construction scheduling system
Leu, Sou-Sen (author) / Yang, Chung-Huei (author)
Construction Management and Economics ; 17 ; 767-776
1999-11-01
10 pages
Article (Journal)
Electronic Resource
English
A genetic algorithm-based optimal resource-constrained scheduling simulation model
Online Contents | 2002
|A genetic algorithm-based optimal resource-constrained scheduling simulation model
British Library Online Contents | 2002
|A GA-based resource-constrained construction scheduling system
British Library Online Contents | 1999
|Improved genetic algorithm for resource-constrained scheduling of large projects
Online Contents | 2009
|