Integration of safety risk data with highway construction schedules
The construction industry is characterized by a relatively high injury and illness rate compared to other industries. Within the construction industry, the highway construction and maintenance sector is one of the most dangerous. To improve safety in this sector, proactive methods of safety improvement and reliable risk data are needed. The safety risk quantification is the first step towards integrating safety data into design and planning. To enhance the current preconstruction safety practices, safety risks of highway construction and maintenance tasks were quantified and a decision support system was developed and tested that integrates safety risk data into the project schedules. Relative safety risks were quantified for 25 common highway construction tasks using the Delphi method. To ensure valid and reliable results, experts were selected according to rigorous requirements and multiple controls were employed to decrease cognitive biases. The data were incorporated into a decision support system called Scheduled-based Safety Risk Assessment and Management (SSRAM) that facilitates integration of safety risk data with project schedules. The resulting data-driven system produces predictive plots of safety risk over time based on the temporal and spatial interactions among concurrent activities. To test the utility of the decision support system and the validity of the underlying risk data, the system was tested on 11 active case study projects in the US. It was found that the database and associated decision support tool produce accurate and reliable risk forecasts that increase the viability of existing safety preconstruction activities.
Integration of safety risk data with highway construction schedules
The construction industry is characterized by a relatively high injury and illness rate compared to other industries. Within the construction industry, the highway construction and maintenance sector is one of the most dangerous. To improve safety in this sector, proactive methods of safety improvement and reliable risk data are needed. The safety risk quantification is the first step towards integrating safety data into design and planning. To enhance the current preconstruction safety practices, safety risks of highway construction and maintenance tasks were quantified and a decision support system was developed and tested that integrates safety risk data into the project schedules. Relative safety risks were quantified for 25 common highway construction tasks using the Delphi method. To ensure valid and reliable results, experts were selected according to rigorous requirements and multiple controls were employed to decrease cognitive biases. The data were incorporated into a decision support system called Scheduled-based Safety Risk Assessment and Management (SSRAM) that facilitates integration of safety risk data with project schedules. The resulting data-driven system produces predictive plots of safety risk over time based on the temporal and spatial interactions among concurrent activities. To test the utility of the decision support system and the validity of the underlying risk data, the system was tested on 11 active case study projects in the US. It was found that the database and associated decision support tool produce accurate and reliable risk forecasts that increase the viability of existing safety preconstruction activities.
Integration of safety risk data with highway construction schedules
Esmaeili, Behzad (author) / Hallowell, Matthew (author)
Construction Management and Economics ; 31 ; 528-541
2013-06-01
14 pages
Article (Journal)
Electronic Resource
English
Integration of safety risk data with highway construction schedules
Online Contents | 2013
|Integration of safety risk data with highway construction schedules
British Library Online Contents | 2013
|Integration of safety risk data with highway construction schedules
British Library Online Contents | 2013
|Accuracy of Highway Contractor's Schedules
British Library Online Contents | 2004
|Accuracy of Highway Contractor's Schedules
Online Contents | 2004
|