A platform for research: civil engineering, architecture and urbanism
Thatcher installation moves raw materials instead of dead tons
Verwendung gegossener Nylon-Elevatorbecher zur Foerderung von Sand, Soda und Kalk in einer Glashuette. (DKI, 2.12.74)
Thatcher installation moves raw materials instead of dead tons
Verwendung gegossener Nylon-Elevatorbecher zur Foerderung von Sand, Soda und Kalk in einer Glashuette. (DKI, 2.12.74)
Thatcher installation moves raw materials instead of dead tons
Eine Foerderanlage befoerdert Rohstoffe anstatt 'toter' Tonnen
Ceram. Age ; 89 ; 1-21
1973
2 Seiten
Article (Journal)
English
FOERDERANLAGE , ROHSTOFF , NYLON , SAND , SODA , KALK , ELEVATORBECHER
Lightweight ready-mixed concrete reduces dead load 8000 tons
Engineering Index Backfile | 1948
|Engineering Index Backfile | 1951
Elsevier | 1991
|Building between Thatcher and Peron
Online Contents | 2002
|Highway bridge specifications by Edwin M. Thatcher
Engineering Index Backfile | 1893