A platform for research: civil engineering, architecture and urbanism
The arctic gas pipeline and its specialized equipment requirements
In the fall of 1977 the governments of both the United States and Canada will make decisions concerning the transport of Arctic gas to southern markets. The Arctic Gas Proposal, which is the only one permitting Alaskan and Canadian gas to move through one system, is compared to others submitted for their consideration. The need for building the Arctic pipeline is discussed and the plans for its construction are outlined. The development of the Banister 812, an Arctic ditcher designed specifically to meet the requirements of this project,is also described.
The arctic gas pipeline and its specialized equipment requirements
In the fall of 1977 the governments of both the United States and Canada will make decisions concerning the transport of Arctic gas to southern markets. The Arctic Gas Proposal, which is the only one permitting Alaskan and Canadian gas to move through one system, is compared to others submitted for their consideration. The need for building the Arctic pipeline is discussed and the plans for its construction are outlined. The development of the Banister 812, an Arctic ditcher designed specifically to meet the requirements of this project,is also described.
The arctic gas pipeline and its specialized equipment requirements
Spezialausruestung fuer Gasfernleitungen in der Arktis
Harvie, J.A. (author)
SAE-Papers ; 1-5
1977
5 Seiten
Conference paper
English
What's New In Specialized Pipeline Equipment
Online Contents | 2001
Engineering Index Backfile | 1941
Management of Specialized Erection Equipment: Safety
British Library Online Contents | 2012
|Specialized Equipment Keeps the Water Flowing
Online Contents | 1998
|Management of Specialized Erection Equipment: Safety
Online Contents | 2012
|