Study on Construction Risk Analysis and Risk Counter-Measures of River-Crossing Tunnel of Large-Diameter Metro
There are numerous difficulties and risks in the construction of river-crossing tunnel of large-diameter metro. How to ensure the safety of the project and reduce the construction risk is the key issue requiring urgent solution. This paper, taking a project of constructing river-crossing tunnel of large-diameter metro as the research background, compared and selected the methods of constructing this river-crossing tunnel. Large-diameter slurry shield machine was recommended to conduct digging construction. Then, possible risks of the selected construction method were analyzed and summarized into two categories: risk concerning the project itself and environmental risk. Finally, corresponding measures to handle the risks were put forward.
Study on Construction Risk Analysis and Risk Counter-Measures of River-Crossing Tunnel of Large-Diameter Metro
There are numerous difficulties and risks in the construction of river-crossing tunnel of large-diameter metro. How to ensure the safety of the project and reduce the construction risk is the key issue requiring urgent solution. This paper, taking a project of constructing river-crossing tunnel of large-diameter metro as the research background, compared and selected the methods of constructing this river-crossing tunnel. Large-diameter slurry shield machine was recommended to conduct digging construction. Then, possible risks of the selected construction method were analyzed and summarized into two categories: risk concerning the project itself and environmental risk. Finally, corresponding measures to handle the risks were put forward.
Study on Construction Risk Analysis and Risk Counter-Measures of River-Crossing Tunnel of Large-Diameter Metro
Hu, Jun (author) / Zeng, Hui (author) / Wang, Xiao-Bin (author)
2012
4 Seiten
Conference paper
English
Trans Tech Publications | 2012
|British Library Conference Proceedings | 2012
|Analysis on Segment Floating in the Construction of Large-Diameter Crossing-River Shield Tunnel
Trans Tech Publications | 2015
|Risk analysis during tunnel construction using Bayesian Networks: Porto Metro case study
DSpace@MIT | 2011
|Risk analysis during tunnel construction using Bayesian Networks: Porto Metro case study
British Library Online Contents | 2012
|