A platform for research: civil engineering, architecture and urbanism
Fluid-Solid Coupling Numerical Simulation for Tunnel in Fracture Zone Based on 2D-FLAC Software
To understand the stressed characteristic of fault rupture zone under high hydraulic pressure, based on the F3 fault of Guanshan tunnel the software 2D-FLAC is adopted to found the fluid-solid coupling numerical model of ground water seepage and evolution in the process of tunnel structure in fault rupture zone under high hydraulic pressure and analyze the mechanical character of tunnel structure in three schemes of whole block, free discharge and limit discharge. The result shows that in the whole block condition, the partial seepage of ground water happened and the lining thickness should be more than 60cm; Regardless of water pressure, the rock is damaged at a large range, and the minimum safety factor of the lining structure meet the tunnel design standard; In the limit discharge condition, the grouting reinforced ring makes the effect of limiting drainage and keeping the tunnel’s stability in the construction. The tunnel drainage gets smaller with the increase of grouting ring’s thickness and the decrease of grouting ring’s penetration parameter; setting the drainage system can decrease the hydraulic pressure at the back of lining as well as grouting and water blocking.
Fluid-Solid Coupling Numerical Simulation for Tunnel in Fracture Zone Based on 2D-FLAC Software
To understand the stressed characteristic of fault rupture zone under high hydraulic pressure, based on the F3 fault of Guanshan tunnel the software 2D-FLAC is adopted to found the fluid-solid coupling numerical model of ground water seepage and evolution in the process of tunnel structure in fault rupture zone under high hydraulic pressure and analyze the mechanical character of tunnel structure in three schemes of whole block, free discharge and limit discharge. The result shows that in the whole block condition, the partial seepage of ground water happened and the lining thickness should be more than 60cm; Regardless of water pressure, the rock is damaged at a large range, and the minimum safety factor of the lining structure meet the tunnel design standard; In the limit discharge condition, the grouting reinforced ring makes the effect of limiting drainage and keeping the tunnel’s stability in the construction. The tunnel drainage gets smaller with the increase of grouting ring’s thickness and the decrease of grouting ring’s penetration parameter; setting the drainage system can decrease the hydraulic pressure at the back of lining as well as grouting and water blocking.
Fluid-Solid Coupling Numerical Simulation for Tunnel in Fracture Zone Based on 2D-FLAC Software
Lai, Jin-Xing (author) / Fan, Hao-Bo (author) / Zhou, Fei (author)
2012
4 Seiten
Conference paper
English
Fluid-Solid Coupling Numerical Simulation for Tunnel in Fracture Zone Based on 2D-FLAC Software
Trans Tech Publications | 2012
|PFC/FLAC Coupled Numerical Simulation of Excavation Damage Zone in Deep Schist Tunnel
Tema Archive | 2012
|Rock Slope Stability Analysis Based on FLAC^3^D Numerical Simulation
British Library Conference Proceedings | 2012
|Design of a backpacked tunnel liner using FLAC
British Library Conference Proceedings | 2001
|SIMULATION OF CONE PENETRATION WITH FLAC
British Library Conference Proceedings | 1999
|