Monitor and Analysis of the Foundation Pit Combination Support of Jinan West Railway Station Ground
The foundation pit of Jinan West Railway Station Ground is vast in area and large in Excavating depth and closely adjacent to the high-speed railway buildings and subgrade, therefore the foundation pits deformation is strictly controlled. The foundation pit supporting design applies a comprehensive mode by combing soil nailing wall, compound soil nailing wall and bored cast-in-situ piles with anchor cables. Monitoring has been carried out on internal force of side slope and supporting structure throughout the excavation of foundation pit, so detailed monitoring data have been acquired. It has been acquired, by contrastively analyzing, that since the foundation pits displacement volume may reach about one half of the final displacement volume at the time when its excavation is completed, with a huge rate of change, supporting should be timely completed during the excavation period. Compound soil nailing wall can reduce side slopes horizontal displacement volume about 25∼30%, compared with soil nailing wall, and effectively add the rigidness of side slope, however it is not very useful for settlement; We get utmost horizontal displacement volume at one third to two fifths of pile length, so it is advised to increase density and strength of anchor cables.
Monitor and Analysis of the Foundation Pit Combination Support of Jinan West Railway Station Ground
The foundation pit of Jinan West Railway Station Ground is vast in area and large in Excavating depth and closely adjacent to the high-speed railway buildings and subgrade, therefore the foundation pits deformation is strictly controlled. The foundation pit supporting design applies a comprehensive mode by combing soil nailing wall, compound soil nailing wall and bored cast-in-situ piles with anchor cables. Monitoring has been carried out on internal force of side slope and supporting structure throughout the excavation of foundation pit, so detailed monitoring data have been acquired. It has been acquired, by contrastively analyzing, that since the foundation pits displacement volume may reach about one half of the final displacement volume at the time when its excavation is completed, with a huge rate of change, supporting should be timely completed during the excavation period. Compound soil nailing wall can reduce side slopes horizontal displacement volume about 25∼30%, compared with soil nailing wall, and effectively add the rigidness of side slope, however it is not very useful for settlement; We get utmost horizontal displacement volume at one third to two fifths of pile length, so it is advised to increase density and strength of anchor cables.
Monitor and Analysis of the Foundation Pit Combination Support of Jinan West Railway Station Ground
Li, Lian-Xiang (author) / Gong, Ming (author) / Zheng, Ying-Jie (author)
2013
10 Seiten
Conference paper
English
Monitor and Analysis of the Foundation Pit Combination Support of Jinan West Railway Station Ground
British Library Conference Proceedings | 2013
|Monitor and Analysis of the Foundation Pit Combination Support of Jinan West Railway Station Ground
Trans Tech Publications | 2013
|Application Scheme Organization of Arrival-Departure Line at Jinan West Railway Station
British Library Conference Proceedings | 2015
|Design of New Buidings of Jinan Railway Station
British Library Online Contents | 1996
|Analysis of Deep Foundation Pit Construction Monitoring in a Metro Station in Jinan City
Online Contents | 2018
|