A platform for research: civil engineering, architecture and urbanism
Three Year Performance of Sacrificial Anode Cathodic Protection System in the Reinforced Concrete Bridge Structures
The aim of this study was to obtain special cathodic protection (CP) behavior in coastal bridge structures. This bridge structure was located to the area where repetition between fresh water and sea water taken place due to ebb and flood tide. In this study, zinc-mesh anode was used as a sacrificial anode. Thus, it was a good opportunity to verify the effectiveness of sacrificial anode CP (SACP) in this special location. Measurement was conducted for three years. Test Factors were corrosion potential, CP potential, 4 hour depolarization potential, and CP current. Moreover, resistivity and corrosion rate were measured by the multi-functional corrosion monitoring sensor (DMS-100, Conclinic Co. Ltd) that could measure potential, galvanic current, corrosion rate, concrete resistivity, and temperature. After three years from installation of CP, it could confirm that although some pier showed low depolarization potential less than 100 mV, most piers showed good protection both electrochemical and physical aspects.
Three Year Performance of Sacrificial Anode Cathodic Protection System in the Reinforced Concrete Bridge Structures
The aim of this study was to obtain special cathodic protection (CP) behavior in coastal bridge structures. This bridge structure was located to the area where repetition between fresh water and sea water taken place due to ebb and flood tide. In this study, zinc-mesh anode was used as a sacrificial anode. Thus, it was a good opportunity to verify the effectiveness of sacrificial anode CP (SACP) in this special location. Measurement was conducted for three years. Test Factors were corrosion potential, CP potential, 4 hour depolarization potential, and CP current. Moreover, resistivity and corrosion rate were measured by the multi-functional corrosion monitoring sensor (DMS-100, Conclinic Co. Ltd) that could measure potential, galvanic current, corrosion rate, concrete resistivity, and temperature. After three years from installation of CP, it could confirm that although some pier showed low depolarization potential less than 100 mV, most piers showed good protection both electrochemical and physical aspects.
Three Year Performance of Sacrificial Anode Cathodic Protection System in the Reinforced Concrete Bridge Structures
Jeong, Jin-A (author) / Jin, Chung-Kuk (author)
2013
9 Seiten
Conference paper
English
Trans Tech Publications | 2013
|New Sacrificial Anode for Cathodic Protection of Reinforced Concrete Structures
British Library Conference Proceedings | 1996
|British Library Conference Proceedings | 1995
|SACRIFICIAL ANODE, CATHODIC PROTECTION METHOD, AND CONCRETE STRUCTURE
European Patent Office | 2022
|