A platform for research: civil engineering, architecture and urbanism
Safety systems for the Trans-Tokyo Bay Highway tunnel project
The Trans Tokyo Bay (TTB) Highway project comprises a 9.5-km-long tunnel to the west and an 5.5-km-long bridge to the east. An average traffic volume of around 11,000 vehicles per day was observed at the end of October 1998, a year after the highway was opened to service. The general planning for the tunnel is discussed, focusing on the provision of safety features and facilities, as well as the public relations system for making drivers aware of these features.
Safety systems for the Trans-Tokyo Bay Highway tunnel project
The Trans Tokyo Bay (TTB) Highway project comprises a 9.5-km-long tunnel to the west and an 5.5-km-long bridge to the east. An average traffic volume of around 11,000 vehicles per day was observed at the end of October 1998, a year after the highway was opened to service. The general planning for the tunnel is discussed, focusing on the provision of safety features and facilities, as well as the public relations system for making drivers aware of these features.
Safety systems for the Trans-Tokyo Bay Highway tunnel project
Yamada, N. (author) / Ota, Y. (author)
Tunnelling and Underground Space Technology ; 14 ; 3-12
1999
10 Seiten, 5 Quellen
Article (Journal)
English
Safety Systems for the Trans-Tokyo Bay Highway Tunnel Project
British Library Online Contents | 1999
|Safety measures for Trans Tokyo Bay Highway (T.T.B.) tunnel project
British Library Conference Proceedings | 1998
|FIRE AND LIFE SAFETY - Safety Systems for the Trans-Tokyo Bay Highway Tunnel Project
Online Contents | 1999
|Die Tunnel des Trans-Tokyo-Bay Highway
Tema Archive | 1994
|Die Tunnel des Trans-Tokyo-Bay Highway
Online Contents | 1994
|