A platform for research: civil engineering, architecture and urbanism
Analysis of the Superstructure of South-to-North Water Diversion Bridge
Based on the South-to-North Water Diversion Bridge (70m+120m+70m prestressed concrete composite box-girder bridge with corrugated steel webs), structural static analysis of the bridge’s superstructure was taken out by finite element method, which were checked with the existing regulatory requirements. The result indicates that the carrying capacity in the ultimate limit state meet the requirement of the standard, the vertical shear stress of corrugated steel web satisfies the standard limit and the thickness of corrugated steel web satisfies the request, but the safety factor is not high.
Analysis of the Superstructure of South-to-North Water Diversion Bridge
Based on the South-to-North Water Diversion Bridge (70m+120m+70m prestressed concrete composite box-girder bridge with corrugated steel webs), structural static analysis of the bridge’s superstructure was taken out by finite element method, which were checked with the existing regulatory requirements. The result indicates that the carrying capacity in the ultimate limit state meet the requirement of the standard, the vertical shear stress of corrugated steel web satisfies the standard limit and the thickness of corrugated steel web satisfies the request, but the safety factor is not high.
Analysis of the Superstructure of South-to-North Water Diversion Bridge
Applied Mechanics and Materials ; 178-181 ; 2125-2130
2012-05-14
6 pages
Article (Journal)
Electronic Resource
English
South-to-north water diversion project
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2013
|British Library Conference Proceedings | 2012
|Trans Tech Publications | 2012
|