A platform for research: civil engineering, architecture and urbanism
Construction Monitoring of Dukeng Bridge
In this paper, a continuous beam arch bridge Dukeng bridge was introduced. Its construction process and its construction monitoring were discussed. In the construction process, the elevations of the box girders measured were closer to the values theoretical calculated. Though construction monitoring, although there were some construction errors, they can be timely adjusted and rectified and the main beam was ensure to smoothly closure.
Construction Monitoring of Dukeng Bridge
In this paper, a continuous beam arch bridge Dukeng bridge was introduced. Its construction process and its construction monitoring were discussed. In the construction process, the elevations of the box girders measured were closer to the values theoretical calculated. Though construction monitoring, although there were some construction errors, they can be timely adjusted and rectified and the main beam was ensure to smoothly closure.
Construction Monitoring of Dukeng Bridge
Advanced Materials Research ; 446-449 ; 1252-1255
2012-01-24
4 pages
Article (Journal)
Electronic Resource
English
Construction Monitoring of Dukeng Bridge
Tema Archive | 2012
|Construction Monitoring of Dukeng Bridge
British Library Conference Proceedings | 2012
|