A platform for research: civil engineering, architecture and urbanism
The Design of Fast Roadway Drivage Support Work Platform
Currently, there is a very difficult problem in coal mine, such as labor intensity and the problem of low safety factor. On the basis of the monorail load form, Roadway drivage support platform to achieve the comprehensive the integration of tunneling work platform of auxiliary transportation and roadway drivage support work.
The Design of Fast Roadway Drivage Support Work Platform
Currently, there is a very difficult problem in coal mine, such as labor intensity and the problem of low safety factor. On the basis of the monorail load form, Roadway drivage support platform to achieve the comprehensive the integration of tunneling work platform of auxiliary transportation and roadway drivage support work.
The Design of Fast Roadway Drivage Support Work Platform
Applied Mechanics and Materials ; 556-562 ; 1116-1118
2014-05-23
3 pages
Article (Journal)
Electronic Resource
English
Equipment for underground roadway drivage: Products and engineering from Neuhäuser GmbH
Tema Archive | 2014
|British Library Conference Proceedings | 2011
|Study of selecting most economical roadway drivage method for Zonguldak hard coal mining area
British Library Conference Proceedings | 2000
|British Library Conference Proceedings | 2011
|