A platform for research: civil engineering, architecture and urbanism
Water Inflow Quantity Evaluation and Prediction for Cimushan Tunnel
Tunnel excavation breaks the original hydrological dynamic balance, promotes water cycle and influences the mountain groundwater system to some extent. Water inflow during construction not only threatens construction safety, but also affects surface vegetation’s growth. Taking tunnel 1 in Chongqing Cimushan area as the project background, and through analyzing the hydrological test results from tunnel exploration stage, counting the actual water inflow quantity in construction period, doing the 3-D finite element numerical modeling, we analyzed and evaluated the tunnel water inflow quantity, to provide reference for recognizing the harm of groundwater and making treatment measures.
Water Inflow Quantity Evaluation and Prediction for Cimushan Tunnel
Tunnel excavation breaks the original hydrological dynamic balance, promotes water cycle and influences the mountain groundwater system to some extent. Water inflow during construction not only threatens construction safety, but also affects surface vegetation’s growth. Taking tunnel 1 in Chongqing Cimushan area as the project background, and through analyzing the hydrological test results from tunnel exploration stage, counting the actual water inflow quantity in construction period, doing the 3-D finite element numerical modeling, we analyzed and evaluated the tunnel water inflow quantity, to provide reference for recognizing the harm of groundwater and making treatment measures.
Water Inflow Quantity Evaluation and Prediction for Cimushan Tunnel
Advanced Materials Research ; 594-597 ; 1269-1274
2012-11-29
6 pages
Article (Journal)
Electronic Resource
English
Water Inflow Quantity Evaluation and Prediction for Cimushan Tunnel
British Library Conference Proceedings | 2012
|Prediction of Construction Water Inflow of Karst Water-Rich Tunnel Without Drainage Tunnel
Springer Verlag | 2024
|Estimating Rock Tunnel Water Inflow
British Library Conference Proceedings | 1995
|Estimating Rock Tunnel Water Inflow-II
British Library Conference Proceedings | 2005
|Water Inflow Amount Prediction for Karst Tunnel with Steady Seepage Conditions
DOAJ | 2023
|