A platform for research: civil engineering, architecture and urbanism
On Pumping Ultra-Early Strength Concrete of Artificial Sand
With the gob-side entry retaining technology in coal mining project, the materials research of backfill for mine gateway side and development to become the focus of attention. This study is based on the need of Faer coal mine to adopt P42.5 portland cement, Tz-1 early strength agent, Tj-1 super plasticizer, prepared from 8 hours to form removal, 16 hours strength of up to 7.9MPa, 24 hours strength of 19MPa, 3 day strength to 37MPa, and the construction of super-excellent early strength pumping artificial sand concrete, and obtained satisfactory results through engineering.
On Pumping Ultra-Early Strength Concrete of Artificial Sand
With the gob-side entry retaining technology in coal mining project, the materials research of backfill for mine gateway side and development to become the focus of attention. This study is based on the need of Faer coal mine to adopt P42.5 portland cement, Tz-1 early strength agent, Tj-1 super plasticizer, prepared from 8 hours to form removal, 16 hours strength of up to 7.9MPa, 24 hours strength of 19MPa, 3 day strength to 37MPa, and the construction of super-excellent early strength pumping artificial sand concrete, and obtained satisfactory results through engineering.
On Pumping Ultra-Early Strength Concrete of Artificial Sand
Advanced Materials Research ; 466-467 ; 61-64
2012-02-10
4 pages
Article (Journal)
Electronic Resource
English
The Research and Application of Pumping Ultra-Early Strength Concrete
British Library Conference Proceedings | 2011
|The Research and Application of Pumping Ultra-Early Strength Concrete
Trans Tech Publications | 2010
|Ultrahigh remote pumping machine-made sand high-strength concrete
European Patent Office | 2024
|Ultra early strength concrete using ultra early strength binder
European Patent Office | 2019
Pumping high-early-strength concrete on building construction
Engineering Index Backfile | 1942