A platform for research: civil engineering, architecture and urbanism
Through the construction process of the Administrative Center Station, Kunming rail traffic, study the construction technology of long spiral bored piles, for engineering characteristics and difficulties, put forward the proposed measures, and analyze the application prospects of the technology.
Through the construction process of the Administrative Center Station, Kunming rail traffic, study the construction technology of long spiral bored piles, for engineering characteristics and difficulties, put forward the proposed measures, and analyze the application prospects of the technology.
Construction Technology of Long Spiral Bored Piles
Advanced Materials Research ; 1065-1069 ; 1564-1567
2014-12-11
4 pages
Article (Journal)
Electronic Resource
English
Construction Technology of Long Spiral Bored Piles
British Library Conference Proceedings | 2015
|NTIS | 1986
Construction technology for long spiral cast-in-situ bored pile
European Patent Office | 2015
|Concrete Bored Piles Construction Productivity Index
British Library Conference Proceedings | 2002
|Taylor & Francis Verlag | 1976
|