A platform for research: civil engineering, architecture and urbanism
Calculation Model for Ground Settlement Process of Xi’an Subway Tunnel Non-Synchronous Excavation with Double-Line
The current calculation models of ground settlement for tunnel excavation cannot reflect ground settlement of tunnel non-synchronous excavation with double-line. Based on the Peck ground settlement formula and Attewell ground settlement formula, displacement release of excavation place and tunnel non-synchronous excavation with double-line have researched. By means of finding a function to replace the accumulated probability curve, the new control function was beneficial to parameter introduced and improvement of the current ground settlement formula. By introducing the non-synchronous excavation distance and the displacement release coefficient of excavation place, A new calculation model for ground settlement process of tunnels non-synchronous excavation with double-line is proposed. The reliability and practical of the calculation models was verified. Research results were very important to analyze the ground settlement affecting the building foundation and pipe under ground.
Calculation Model for Ground Settlement Process of Xi’an Subway Tunnel Non-Synchronous Excavation with Double-Line
The current calculation models of ground settlement for tunnel excavation cannot reflect ground settlement of tunnel non-synchronous excavation with double-line. Based on the Peck ground settlement formula and Attewell ground settlement formula, displacement release of excavation place and tunnel non-synchronous excavation with double-line have researched. By means of finding a function to replace the accumulated probability curve, the new control function was beneficial to parameter introduced and improvement of the current ground settlement formula. By introducing the non-synchronous excavation distance and the displacement release coefficient of excavation place, A new calculation model for ground settlement process of tunnels non-synchronous excavation with double-line is proposed. The reliability and practical of the calculation models was verified. Research results were very important to analyze the ground settlement affecting the building foundation and pipe under ground.
Calculation Model for Ground Settlement Process of Xi’an Subway Tunnel Non-Synchronous Excavation with Double-Line
Applied Mechanics and Materials ; 90-93 ; 2221-2225
2011-09-08
5 pages
Article (Journal)
Electronic Resource
English
British Library Conference Proceedings | 2011
|Surface Settlement and Influence on Xi’an City Wall due to Xi’an Subway Line 2 Tunnel Construction
Trans Tech Publications | 2011
|Optimizing Sequential Excavation Method for Ground Settlement Control in Tehran Subway Tunnel Line 6
Springer Verlag | 2024
|Prediction on Ground Surface Settlement Caused by Subway Shield Construction in Xi'an
British Library Conference Proceedings | 2013
|Prediction on Ground Surface Settlement Caused by Subway Shield Construction in Xi'an
Trans Tech Publications | 2013
|