A platform for research: civil engineering, architecture and urbanism
Current specification, does not specify the full construction process. In practice, the majority of construction units according to their own experience, hard to get reliable assurance of construction quality. In the early development of new and the high permeability type layer-penetration oil on the basis of construction of the test section of this article relies on permeable layer, oil on high permeable layer construction process, quality testing, and control indicators complete process was studied, test construction and achieved good results.
Current specification, does not specify the full construction process. In practice, the majority of construction units according to their own experience, hard to get reliable assurance of construction quality. In the early development of new and the high permeability type layer-penetration oil on the basis of construction of the test section of this article relies on permeable layer, oil on high permeable layer construction process, quality testing, and control indicators complete process was studied, test construction and achieved good results.
Research on Construction Technology of the High Permeability Type Layer-Penetration Oil Production
Applied Mechanics and Materials ; 580-583 ; 2533-2538
2014-07-04
6 pages
Article (Journal)
Electronic Resource
English
Research on Construction Technology of the High Permeability Type Layer-Penetration Oil Production
British Library Conference Proceedings | 2014
|Research on High Permeability Layer-Penetration Oil Production
British Library Conference Proceedings | 2014
|Analysis on Permeability of High Permeability Layer-Penetration Oil Influencing Factors
British Library Conference Proceedings | 2014
|Analysis on Permeability of High Permeability Layer-Penetration Oil Influencing Factors
Trans Tech Publications | 2014
|Study on Preparation Experimental about High-Permeability Layer-Penetration Oil
Tema Archive | 2013
|