A platform for research: civil engineering, architecture and urbanism
Numerical Analysis of Tunnel Excavation Method at Greatly Cross Undermine Huangzhuang Station of Beijing Subway
Combined with the geological conditions and the project features, the selection problem of pilot tunnel construction method of Huangzhuang station is solved. Directing at the commonly used method including CD method, CRD method and double side wall pilot tunnel method, FLAC3D numerical calculation method is adapted to analysis and predict the ground surface deformation and supporting structure hand features. Through analyzing the size and law of surface settlement in this section, the feasibility and differences of these methods is concluded and analyzed. And finally an example is given.
Numerical Analysis of Tunnel Excavation Method at Greatly Cross Undermine Huangzhuang Station of Beijing Subway
Combined with the geological conditions and the project features, the selection problem of pilot tunnel construction method of Huangzhuang station is solved. Directing at the commonly used method including CD method, CRD method and double side wall pilot tunnel method, FLAC3D numerical calculation method is adapted to analysis and predict the ground surface deformation and supporting structure hand features. Through analyzing the size and law of surface settlement in this section, the feasibility and differences of these methods is concluded and analyzed. And finally an example is given.
Numerical Analysis of Tunnel Excavation Method at Greatly Cross Undermine Huangzhuang Station of Beijing Subway
Advanced Materials Research ; 243-249 ; 5789-5793
2011-05-17
5 pages
Article (Journal)
Electronic Resource
English
British Library Conference Proceedings | 2011
|European Patent Office | 2024
|Cover excavation construction method for building subway station by means of shield tunnel
European Patent Office | 2021
|Subway station deep foundation pit excavation construction method
European Patent Office | 2015
|