A platform for research: civil engineering, architecture and urbanism
Force Analysis of the Middle Wall in Multi-Arch Tunnel under Central Hole + CRD Method
arch tunnel construction in the presence of construction mechanics often unclear, the lack of systematic design and construction of the theory can learn. Harbin Clinic Road thesis double-arch tunnel project as the basis, the construction process through its hole + CRD using the finite element simulation analysis and on-site monitoring measurement data processing, engineering arch tunnel song used in the wall study the mechanical properties.
Force Analysis of the Middle Wall in Multi-Arch Tunnel under Central Hole + CRD Method
arch tunnel construction in the presence of construction mechanics often unclear, the lack of systematic design and construction of the theory can learn. Harbin Clinic Road thesis double-arch tunnel project as the basis, the construction process through its hole + CRD using the finite element simulation analysis and on-site monitoring measurement data processing, engineering arch tunnel song used in the wall study the mechanical properties.
Force Analysis of the Middle Wall in Multi-Arch Tunnel under Central Hole + CRD Method
Applied Mechanics and Materials ; 580-583 ; 1188-1191
2014-07-04
4 pages
Article (Journal)
Electronic Resource
English
Force Analysis of the Middle Wall in Multi-Arch Tunnel under Central Hole + CRD Method
British Library Conference Proceedings | 2014
|British Library Conference Proceedings | 2014
|Trans Tech Publications | 2014
|