A platform for research: civil engineering, architecture and urbanism
Analysis of Settlement Caused by Tunnel Underneath Existing Railway after Construction
For the existing railway, the settlement after construction caused by the tunnel underneath it is completed after the tunnel has been constructed. It is the result that the stress adjustment and consolidation of soil enhanced itself under the live load of train. Through the settlement can be calculated by peck formula in the stage of and after construction, for the settlement after construction, the peck formula must be transformed with the fitting monitoring curve. With the engineering example, the fitting formula of settlement after construction can be used for analysis and prediction of similar engineering.
Analysis of Settlement Caused by Tunnel Underneath Existing Railway after Construction
For the existing railway, the settlement after construction caused by the tunnel underneath it is completed after the tunnel has been constructed. It is the result that the stress adjustment and consolidation of soil enhanced itself under the live load of train. Through the settlement can be calculated by peck formula in the stage of and after construction, for the settlement after construction, the peck formula must be transformed with the fitting monitoring curve. With the engineering example, the fitting formula of settlement after construction can be used for analysis and prediction of similar engineering.
Analysis of Settlement Caused by Tunnel Underneath Existing Railway after Construction
Advanced Materials Research ; 779-780 ; 534-537
2013-09-04
4 pages
Article (Journal)
Electronic Resource
English
Tunneling-Induced Settlement Evaluation for Underneath Existing Tunnel
British Library Conference Proceedings | 2014
|DOAJ | 2023
|Analysis of the settlement of an existing tunnel induced by shield tunneling underneath
British Library Online Contents | 2018
|