A platform for research: civil engineering, architecture and urbanism
Vertical Load-Carrying Natural Frequency of Railway Double-Track Pre-Stressed Concrete Continuous Bridge
The railway double-track continuous bridge vertical load-carrying frequency is theoretical derived with the vehicle-bridge system mode1. The vertical load-carrying frequencies of the 40 m+4×72 m+40 m party pre-stressed concrete continuous box-girder bridge are calculated, when two trains with 20 same high-speed passenger vehicles are traveling on the bridge from both ends. The change regularity of this double-track continuous bridge vertical load-carrying natural frequency with two trains on it is similar with that of the single-track simply supported bridge and this bridge as one train on it. This bridge vertical load-carrying frequency when two trains on it is smaller than that only train on it. The maximum deviation percentage between the vertical load-carrying natural frequency and the vertical natural frequency is 1.17837%.This bridge vertical load-carrying frequency can be replaced by its natural frequency, and there isn’t obvious error. If the vertical load-carrying frequency should be calculated, it can be replaced by the average value.
Vertical Load-Carrying Natural Frequency of Railway Double-Track Pre-Stressed Concrete Continuous Bridge
The railway double-track continuous bridge vertical load-carrying frequency is theoretical derived with the vehicle-bridge system mode1. The vertical load-carrying frequencies of the 40 m+4×72 m+40 m party pre-stressed concrete continuous box-girder bridge are calculated, when two trains with 20 same high-speed passenger vehicles are traveling on the bridge from both ends. The change regularity of this double-track continuous bridge vertical load-carrying natural frequency with two trains on it is similar with that of the single-track simply supported bridge and this bridge as one train on it. This bridge vertical load-carrying frequency when two trains on it is smaller than that only train on it. The maximum deviation percentage between the vertical load-carrying natural frequency and the vertical natural frequency is 1.17837%.This bridge vertical load-carrying frequency can be replaced by its natural frequency, and there isn’t obvious error. If the vertical load-carrying frequency should be calculated, it can be replaced by the average value.
Vertical Load-Carrying Natural Frequency of Railway Double-Track Pre-Stressed Concrete Continuous Bridge
Advanced Materials Research ; 255-260 ; 797-800
2011-05-31
4 pages
Article (Journal)
Electronic Resource
English
British Library Conference Proceedings | 2011
|British Library Conference Proceedings | 2012
|Vertical Load-Carrying Natural Frequency of Railway Double-Track Steel Truss Continuous Bridge
Trans Tech Publications | 2011
|Vertical Load-Carrying Natural Frequency of Railway Double-Track Steel Truss Continuous Bridge
British Library Conference Proceedings | 2011
|