A platform for research: civil engineering, architecture and urbanism
Performance of the Inducing Joints in Xiaowan Arch Dam with Reservoir Impounded to Normal Water Level
To reduce the tensile stress at dam heel, inducing joints have been set in Xiaowan arch dam; they were designed to work without water pressure. After the reservoir was impounded to the normal water level of E.L.1240m, monitoring data showed that almost half of the inducing joints were working with water pressure, but leakage remained small. It also indicated the opening and shear deformation of all the inducing joints were small, and the joint surface remained in compression although the compressive stress was decreased by 2.03MPa~9.29MPa. So it can be concluded that the inducing joints are generally working at closing and compressive state. However, some abnormalities were detected: large seepage pressure and increasing crack width in block No.16 which is at the right end of the inducing joints; 5 small cracks appeared with leakage water at the downstream inner surface of the inspection gallery of the inducing joint in block No.22. Therefore, close attention has to be paid to the crack propagation around the inducing joints for the safety monitoring in future.
Performance of the Inducing Joints in Xiaowan Arch Dam with Reservoir Impounded to Normal Water Level
To reduce the tensile stress at dam heel, inducing joints have been set in Xiaowan arch dam; they were designed to work without water pressure. After the reservoir was impounded to the normal water level of E.L.1240m, monitoring data showed that almost half of the inducing joints were working with water pressure, but leakage remained small. It also indicated the opening and shear deformation of all the inducing joints were small, and the joint surface remained in compression although the compressive stress was decreased by 2.03MPa~9.29MPa. So it can be concluded that the inducing joints are generally working at closing and compressive state. However, some abnormalities were detected: large seepage pressure and increasing crack width in block No.16 which is at the right end of the inducing joints; 5 small cracks appeared with leakage water at the downstream inner surface of the inspection gallery of the inducing joint in block No.22. Therefore, close attention has to be paid to the crack propagation around the inducing joints for the safety monitoring in future.
Performance of the Inducing Joints in Xiaowan Arch Dam with Reservoir Impounded to Normal Water Level
Applied Mechanics and Materials ; 405-408 ; 511-520
2013-09-03
10 pages
Article (Journal)
Electronic Resource
English
British Library Conference Proceedings | 2013
|Analysis of Inducing Joints Behavior during Reservoir Filling in Xiaowan Arch Dam
British Library Conference Proceedings | 2010
|Xiaowan arch dam stability: Part II
Online Contents | 1996