A platform for research: civil engineering, architecture and urbanism
Ultimate Bearing Capacity Analysis of Concrete Filled Steel Tubular Arch Considering the Initial Defects’ Influence
In the CFST arch bridge construction process, for the reasons of arch axis deviation as prefabricated or constructed, the bearing capacity of arch-rib decreased. This paper considers material and geometric non-linear double factors, calculates the arch-rib ultimate bearing capacity of a CFST arch/continuous beam bridge with defects of arch axis deviation and steel yield stress decrease because of heat treatment, obtain the influence of defects to arch bearing capacity.
Ultimate Bearing Capacity Analysis of Concrete Filled Steel Tubular Arch Considering the Initial Defects’ Influence
In the CFST arch bridge construction process, for the reasons of arch axis deviation as prefabricated or constructed, the bearing capacity of arch-rib decreased. This paper considers material and geometric non-linear double factors, calculates the arch-rib ultimate bearing capacity of a CFST arch/continuous beam bridge with defects of arch axis deviation and steel yield stress decrease because of heat treatment, obtain the influence of defects to arch bearing capacity.
Ultimate Bearing Capacity Analysis of Concrete Filled Steel Tubular Arch Considering the Initial Defects’ Influence
Advanced Materials Research ; 446-449 ; 1248-1251
2012-01-24
4 pages
Article (Journal)
Electronic Resource
English
British Library Conference Proceedings | 2012
|SAGE Publications | 2019
|