A platform for research: civil engineering, architecture and urbanism
Application of the CRD Method in Construction of an Ultra-Shallow, Ultra-High Section and Large-Span Mined Tunnel
This paper explain the controllable factors of the application of the CRD method in the construction of an ultra-shallow, ultra-high section and large-span mined tunnel. And it also introduce the construction scheme of the application on the background of the Ou-Zhuang station air duct C of Guangzhou Metro line No.5. The practical application shows that the CRD method is not only an applicable method but also a necessary means for this kind of tunnel.
Application of the CRD Method in Construction of an Ultra-Shallow, Ultra-High Section and Large-Span Mined Tunnel
This paper explain the controllable factors of the application of the CRD method in the construction of an ultra-shallow, ultra-high section and large-span mined tunnel. And it also introduce the construction scheme of the application on the background of the Ou-Zhuang station air duct C of Guangzhou Metro line No.5. The practical application shows that the CRD method is not only an applicable method but also a necessary means for this kind of tunnel.
Application of the CRD Method in Construction of an Ultra-Shallow, Ultra-High Section and Large-Span Mined Tunnel
Advanced Materials Research ; 790 ; 231-234
2013-09-04
4 pages
Article (Journal)
Electronic Resource
English
British Library Conference Proceedings | 2013
|Study on Identification of Construction Method for Ultra-Large-Span Tunnel
DOAJ | 2020
|Construction method of ultra-shallow-buried large-span underground excavation subway station
European Patent Office | 2023
|European Patent Office | 2024
|