A platform for research: civil engineering, architecture and urbanism
Study on Construction of Long Span and Soft Rock Tunnel with Numerical Simulation
With characteristics of the long span and soft rock tunnel, this paper analyzes the main factors affecting tunnel stable on the basis of the way of tunnel excavation method. The large finite element program is used in research of a tunnel, with a numerical simulation of two different way, top heading and bench method and double side drift method. From the result of stress field and displacement field of the tunnel , some useful conclusion are obtained, that double side drift method is appropriate for this kind of soft rock tunnel.
Study on Construction of Long Span and Soft Rock Tunnel with Numerical Simulation
With characteristics of the long span and soft rock tunnel, this paper analyzes the main factors affecting tunnel stable on the basis of the way of tunnel excavation method. The large finite element program is used in research of a tunnel, with a numerical simulation of two different way, top heading and bench method and double side drift method. From the result of stress field and displacement field of the tunnel , some useful conclusion are obtained, that double side drift method is appropriate for this kind of soft rock tunnel.
Study on Construction of Long Span and Soft Rock Tunnel with Numerical Simulation
Applied Mechanics and Materials ; 438-439 ; 964-967
2013-10-15
4 pages
Article (Journal)
Electronic Resource
English
Study on Construction of Long Span and Soft Rock Tunnel with Numerical Simulation
British Library Conference Proceedings | 2013
|Research on Construction Technology of Shallow-Buried and Long-Span Railway Tunnel in Soft Rock
Trans Tech Publications | 2013
|Research on Construction Technology of Shallow-Buried and Long-Span Railway Tunnel in Soft Rock
British Library Conference Proceedings | 2013
|The Bench Method Numerical Simulation of Soft Rock Tunnel
Trans Tech Publications | 2013
|