A platform for research: civil engineering, architecture and urbanism
3D Analytical Solution of Soil Deformation Induced by Shield Tunnelling Construction
Three-dimensional (3D) analytical solution of soil deformation induced by ground loss in shield tunnelling construction was researched. It is put forward that the ground loss ratio is not a fixed value, but changes in driving direction. The calculation formula of ground loss ratio in driving direction was deduced. Based on two-dimensional (2D) analytical solution of uniform ground movement model of shield tunnelling, the three-dimensional analytical solution of ground deformation induced by ground loss is deduced. The settlement in vertical direction and the displacement in lateral horizontal direction at any point can be calculated; and the method is only applied to the construction phase. In analytical calculation: the predicted soil displacements are in good agreement with the measured values, and the method is easy to use; the closer the soil to tunnel is, the faster the lateral horizontal displacement changes; the extent of change of lateral horizontal displacement in longitudinal direction is smaller than displacement in lateral direction.
3D Analytical Solution of Soil Deformation Induced by Shield Tunnelling Construction
Three-dimensional (3D) analytical solution of soil deformation induced by ground loss in shield tunnelling construction was researched. It is put forward that the ground loss ratio is not a fixed value, but changes in driving direction. The calculation formula of ground loss ratio in driving direction was deduced. Based on two-dimensional (2D) analytical solution of uniform ground movement model of shield tunnelling, the three-dimensional analytical solution of ground deformation induced by ground loss is deduced. The settlement in vertical direction and the displacement in lateral horizontal direction at any point can be calculated; and the method is only applied to the construction phase. In analytical calculation: the predicted soil displacements are in good agreement with the measured values, and the method is easy to use; the closer the soil to tunnel is, the faster the lateral horizontal displacement changes; the extent of change of lateral horizontal displacement in longitudinal direction is smaller than displacement in lateral direction.
3D Analytical Solution of Soil Deformation Induced by Shield Tunnelling Construction
Advanced Materials Research ; 261-263 ; 1814-1819
2011-05-31
6 pages
Article (Journal)
Electronic Resource
English
3D Analytical Solution of Soil Deformation Induced by Shield Tunnelling Construction
British Library Conference Proceedings | 2011
|Convergence Deformation of Existing Shield Tunnel Induced by Adjacent Shield Tunnelling Construction
Springer Verlag | 2024
|Shield construction techniques in tunnelling
TIBKAT | 2021
|Shield construction techniques in tunnelling
UB Braunschweig | 2021
|