A platform for research: civil engineering, architecture and urbanism
Evolution of Reconstruction of Plecnik Footbridge at Prague Castle
The sample of not sustainable way of reconstruction of small but important and significant structure of Plecnik ́s foot bridge located at Prague Castle area is discussed at this contribution. The structure was strongly impaired 10 years after complex reconstruction. This damage and degradation was caused mainly due to malfunctioning of new waterproofing and frozen water in the drainage system of the bridge deck.
Evolution of Reconstruction of Plecnik Footbridge at Prague Castle
The sample of not sustainable way of reconstruction of small but important and significant structure of Plecnik ́s foot bridge located at Prague Castle area is discussed at this contribution. The structure was strongly impaired 10 years after complex reconstruction. This damage and degradation was caused mainly due to malfunctioning of new waterproofing and frozen water in the drainage system of the bridge deck.
Evolution of Reconstruction of Plecnik Footbridge at Prague Castle
Advanced Materials Research ; 923 ; 117-120
2014-04-17
4 pages
Article (Journal)
Electronic Resource
English
Evolution of Reconstruction of Plecnik Footbridge at Prague Castle
British Library Conference Proceedings | 2014
|The Plecnik´s Reconstructed Footbridge at Prague Castle, Eleven Years after
Trans Tech Publications | 2018
|JOSIP PLECNIK: AN ARCHITECT OF PRAGUE CASTLE
Online Contents | 1998
|DataCite | 2013
|Joe Plečnik — Vienna, Prague and Ljubljana Essay: Joe Plečnik (1872-1957)
Online Contents | 2010
|