A platform for research: civil engineering, architecture and urbanism
Pile Foundation Construction jobs are usually wet process has contaminated a large, long duration, the pile of inconsistent quality, cost out. And long bored piles to adapt to a variety of complex geological conditions, but not the impact of water table, is widely used in various projects of the foundation engineering, this according to subway construction in Kunming, the application of experience, a brief description length screw pile construction anti-interpolation technology.
Pile Foundation Construction jobs are usually wet process has contaminated a large, long duration, the pile of inconsistent quality, cost out. And long bored piles to adapt to a variety of complex geological conditions, but not the impact of water table, is widely used in various projects of the foundation engineering, this according to subway construction in Kunming, the application of experience, a brief description length screw pile construction anti-interpolation technology.
Auger Bored Piles Application Works in the Subway
Applied Mechanics and Materials ; 580-583 ; 1301-1305
2014-07-04
5 pages
Article (Journal)
Electronic Resource
English
Auger Bored Piles Application Works in the Subway
British Library Conference Proceedings | 2014
|Driven, bored and auger piles in calcareous soils
British Library Conference Proceedings | 2001
|NTIS | 1986
Taylor & Francis Verlag | 1976
|Bored, continuous flight auger and omega instrumented piles: Behavior under compression
British Library Conference Proceedings | 2005
|