A platform for research: civil engineering, architecture and urbanism
Stress Monitoring on Cantilever Construction Stage of the Main Bridge of South-to-North Water Transfers Canal
This paper presents the importance of stress monitoring in cantilever construction stage of concrete continuous bridge. The stress analysis model based on the actual bridge is established by the beam elements. The measuring measurement scheme and influencing factors of stress monitoring are introduced. The measured results matched the calculated results very well, which meet the needs of construction safety.
Stress Monitoring on Cantilever Construction Stage of the Main Bridge of South-to-North Water Transfers Canal
This paper presents the importance of stress monitoring in cantilever construction stage of concrete continuous bridge. The stress analysis model based on the actual bridge is established by the beam elements. The measuring measurement scheme and influencing factors of stress monitoring are introduced. The measured results matched the calculated results very well, which meet the needs of construction safety.
Stress Monitoring on Cantilever Construction Stage of the Main Bridge of South-to-North Water Transfers Canal
Advanced Materials Research ; 446-449 ; 1213-1216
2012-01-24
4 pages
Article (Journal)
Electronic Resource
English
British Library Conference Proceedings | 2012
|European Patent Office | 2024
|British Library Conference Proceedings | 2012
|Trans Tech Publications | 2012
|