Construction delays : understanding them clearly, analyzing them correctly
Project scheduling -- Types of construction delays -- Measuring delays--the basics -- Delay analysis using bar chart schedules -- Delay analysis using CPM schedules -- Delay analysis using no schedules -- Other analysis techniques--their strengths and weaknesses -- The owner's damages due to delay -- The contractor's damages due to delay -- Home office overhead -- Inefficiency caused by delay -- Acceleration -- Other categories of delay damages -- Determining responsibility for delay -- Risk management
Delays in construction projects are frequently expensive, since there is usually a construction loan involved which charges interest, management staff dedicated to the project whose costs are time dependent, and ongoing inflation in wage and material prices. Many techniques are used to analyze delays. Some of these methods have inherent weaknesses and should be avoided. This book points out the shortcomings of these faulty methods and explains how a delay analysis should be performed. It then describes specifically how the analysis is done with CPM schedules. A explanation of delays and delay
Construction delays : understanding them clearly, analyzing them correctly
Project scheduling -- Types of construction delays -- Measuring delays--the basics -- Delay analysis using bar chart schedules -- Delay analysis using CPM schedules -- Delay analysis using no schedules -- Other analysis techniques--their strengths and weaknesses -- The owner's damages due to delay -- The contractor's damages due to delay -- Home office overhead -- Inefficiency caused by delay -- Acceleration -- Other categories of delay damages -- Determining responsibility for delay -- Risk management
Delays in construction projects are frequently expensive, since there is usually a construction loan involved which charges interest, management staff dedicated to the project whose costs are time dependent, and ongoing inflation in wage and material prices. Many techniques are used to analyze delays. Some of these methods have inherent weaknesses and should be avoided. This book points out the shortcomings of these faulty methods and explains how a delay analysis should be performed. It then describes specifically how the analysis is done with CPM schedules. A explanation of delays and delay
Construction delays : understanding them clearly, analyzing them correctly
2nd ed
2009
Online Ressource (xvi, 266 p., [12] p. of plates)
ill. (some col.)
In: Knovel library. - Dateiformat Volltext: PDF. - Previous ed.: Construction delays : documenting causes, winning claims, recovering costs / Theodore J. Trauner, Jr. - Additional authors: William A. Manginelli, J. Scott Lowe, Mark F. Nagata, Brian J. Furniss. - Includes index. - Description based on print version record
Book
Electronic Resource
English
DDC:
692
Take Samples - But take them correctly
Online Contents | 1997
|Take Samples - But take them correctly
British Library Online Contents | 1997
Nonresidential construction: Keep them wagons rollin'
Online Contents | 1997
Nonresidential construction: Keep them wagons rollin'
British Library Online Contents | 1997