Review of the ”Tunnel Seismic While Drilling“ measurements during construction of the Koralm Tunnel at section KAT2Erkenntnisse aus den „Tunnel Seismic While Drilling” Messungen während des Vortriebs am Koralmtunnel Baulos KAT2
The 32.9 km long Koralm tunnel (Austria) is the core piece of the Koralm railway and will be one of the longest railway tunnels worldwide after completion. At the longest construction section ”KAT2“ two approx. 17 km long parallel single‐track tunnels were driven by two double‐shield tunnel boring machines with a diameter of about 10 m. Accompanying the tunnelling of the two tubes, the continuous Tunnel Seismic While Drilling (TSWD) method was used shortly after the start of mechanical excavation in January 2013 until the final position was reached in February 2018. The aim was to consistently explore the rock mass up to 100 m in front of the tunnel face to detect faults and water‐bearing zones which were relevant for tunnel construction. Another purpose of the measurements was to reduce the number of exploration drillings ahead of the tunnel face. After an initial test phase of about 5000 m, where exploration drillings were continuously carried out parallel with TSWD, an advanced and optimized exploration concept was evaluated and performed for permanent operation. This paper summarizes the findings gained from the TSWD measurements at this tunnel site.
Der 32,9 km lange Koralmtunnel ist das Kernstück der Koralmbahn und wird nach Fertigstellung einer der längsten Eisenbahntunnel weltweit sein. Im Baulos KAT2 haben zwei Doppelschild‐Tunnelbohrmaschinen mit einem Durchmesser von etwa 10 m zwei parallele eingleisige, ca. 17 km lange Tunnelröhren aufgefahren. Begleitend zum maschinellen Vortrieb der beiden Röhren kam kurz nach Vortriebsbeginn im Januar 2013 bis zum Erreichen der Endposition im Februar 2018 die kontinuierliche tunnelseismische Vorauserkundungsmethode Tunnel Seismic While Drilling (TSWD) zum Einsatz. Ziel war es, das Gebirge bis zu 100 m vor die Ortsbrust hinsichtlich bautechnisch relevanter Störungen und wasserführender Zonen zu erkunden und gleichzeitig die Anzahl der Vorauserkundungsbohrungen vor der Ortsbrust zu reduzieren. Nach einer anfänglichen Testphase auf den ersten 5000 m, in der Vorauserkundungsbohrungen kontinuierlich und parallel zu TSWD durchgeführt wurden, wurde ein optimales Vorauserkundungskonzept evaluiert und danach auf Dauerbetrieb umgestellt. Die vorliegende Arbeit fasst die aus den TSWD‐Messungen gewonnenen Erkenntnisse zusammen.
Review of the ”Tunnel Seismic While Drilling“ measurements during construction of the Koralm Tunnel at section KAT2Erkenntnisse aus den „Tunnel Seismic While Drilling” Messungen während des Vortriebs am Koralmtunnel Baulos KAT2
The 32.9 km long Koralm tunnel (Austria) is the core piece of the Koralm railway and will be one of the longest railway tunnels worldwide after completion. At the longest construction section ”KAT2“ two approx. 17 km long parallel single‐track tunnels were driven by two double‐shield tunnel boring machines with a diameter of about 10 m. Accompanying the tunnelling of the two tubes, the continuous Tunnel Seismic While Drilling (TSWD) method was used shortly after the start of mechanical excavation in January 2013 until the final position was reached in February 2018. The aim was to consistently explore the rock mass up to 100 m in front of the tunnel face to detect faults and water‐bearing zones which were relevant for tunnel construction. Another purpose of the measurements was to reduce the number of exploration drillings ahead of the tunnel face. After an initial test phase of about 5000 m, where exploration drillings were continuously carried out parallel with TSWD, an advanced and optimized exploration concept was evaluated and performed for permanent operation. This paper summarizes the findings gained from the TSWD measurements at this tunnel site.
Der 32,9 km lange Koralmtunnel ist das Kernstück der Koralmbahn und wird nach Fertigstellung einer der längsten Eisenbahntunnel weltweit sein. Im Baulos KAT2 haben zwei Doppelschild‐Tunnelbohrmaschinen mit einem Durchmesser von etwa 10 m zwei parallele eingleisige, ca. 17 km lange Tunnelröhren aufgefahren. Begleitend zum maschinellen Vortrieb der beiden Röhren kam kurz nach Vortriebsbeginn im Januar 2013 bis zum Erreichen der Endposition im Februar 2018 die kontinuierliche tunnelseismische Vorauserkundungsmethode Tunnel Seismic While Drilling (TSWD) zum Einsatz. Ziel war es, das Gebirge bis zu 100 m vor die Ortsbrust hinsichtlich bautechnisch relevanter Störungen und wasserführender Zonen zu erkunden und gleichzeitig die Anzahl der Vorauserkundungsbohrungen vor der Ortsbrust zu reduzieren. Nach einer anfänglichen Testphase auf den ersten 5000 m, in der Vorauserkundungsbohrungen kontinuierlich und parallel zu TSWD durchgeführt wurden, wurde ein optimales Vorauserkundungskonzept evaluiert und danach auf Dauerbetrieb umgestellt. Die vorliegende Arbeit fasst die aus den TSWD‐Messungen gewonnenen Erkenntnisse zusammen.
Review of the ”Tunnel Seismic While Drilling“ measurements during construction of the Koralm Tunnel at section KAT2Erkenntnisse aus den „Tunnel Seismic While Drilling” Messungen während des Vortriebs am Koralmtunnel Baulos KAT2
Chwatal, Werner (author) / Domenig, Angela (author) / Kostial, Dieter (author) / Rudel, Thomas (author) / Schlögel, Günter (author) / Katzianer, Erhard (author) / Wagner, Hanns (author)
Geomechanics and Tunnelling ; 14 ; 616-625
2021-10-01
10 pages
Article (Journal)
Electronic Resource
German
Seismik , Vorauserkundung , TSWD , KAT2 tunnel prognosis , seismic , TSWD , KAT2