A platform for research: civil engineering, architecture and urbanism
Estimating channel‐forming discharge in urban watercourses
Several methods of estimating channel‐forming discharge were conducted on 12 quasi‐stable urban stream channels ranging from 9 to 99% urban land use to test their applicability in the urban condition. Bankfull stage was identified at a series of locations along each study reach and it was found that the most consistent observations of bankfull discharge occurred during flood conditions where bankfull stage was identified at the top of point bars along the convex arc of bends. The largest errors in estimation occurred at gauge stations where cross‐sectional geometry had been altered to conform to bridges or culverts rather than the channel morphology. Independent evaluations of channel forming discharge were conducted by 11 practitioners ranging from 10 years to 43 years of experience with similar findings and errors.
Various methods of relating frequency return periods were evaluated using annual peak series discharge observations and continuous 15‐min systematic discharge records using partial duration series analysis. Bankfull discharge was observed to occur more than once a year in all of the urban streams studied and often averaged from 4 to 8 bankfull discharge or larger events per year. In one particular case in a single given year 18 events exceeding bankfull discharge were observed. No specific correlations were identified between frequency return periods and land use change. However, based upon the findings of this study, the applicability of employing annual series peak discharge data to evaluate bankfull frequency return in urban stream channels is highly discouraged. Copyright © 2010 John Wiley & Sons, Ltd.
Estimating channel‐forming discharge in urban watercourses
Several methods of estimating channel‐forming discharge were conducted on 12 quasi‐stable urban stream channels ranging from 9 to 99% urban land use to test their applicability in the urban condition. Bankfull stage was identified at a series of locations along each study reach and it was found that the most consistent observations of bankfull discharge occurred during flood conditions where bankfull stage was identified at the top of point bars along the convex arc of bends. The largest errors in estimation occurred at gauge stations where cross‐sectional geometry had been altered to conform to bridges or culverts rather than the channel morphology. Independent evaluations of channel forming discharge were conducted by 11 practitioners ranging from 10 years to 43 years of experience with similar findings and errors.
Various methods of relating frequency return periods were evaluated using annual peak series discharge observations and continuous 15‐min systematic discharge records using partial duration series analysis. Bankfull discharge was observed to occur more than once a year in all of the urban streams studied and often averaged from 4 to 8 bankfull discharge or larger events per year. In one particular case in a single given year 18 events exceeding bankfull discharge were observed. No specific correlations were identified between frequency return periods and land use change. However, based upon the findings of this study, the applicability of employing annual series peak discharge data to evaluate bankfull frequency return in urban stream channels is highly discouraged. Copyright © 2010 John Wiley & Sons, Ltd.
Estimating channel‐forming discharge in urban watercourses
Annable, W. K. (author) / Lounder, V. G. (author) / Watson, C. C. (author)
River Research and Applications ; 27 ; 738-753
2011-07-01
16 pages
Article (Journal)
Electronic Resource
English
British Library Conference Proceedings | 2000
|Managing urban watercourses in Northern Ireland's small towns
British Library Conference Proceedings | 1995
|Restoration of Polluted Urban Watercourses in Tokyo for Community Use
British Library Conference Proceedings | 1999
|Act Covers Man‐made Watercourses
Wiley | 1989