A platform for research: civil engineering, architecture and urbanism
Pumping Tests
This chapter contains sections titled:
When a Pumping Test Is Advisable
Planning the Pumping Test
Design of the Pumping Well
Piezometer Array
Duration of Drawdown and Recovery
Pumping Rate
Monitoring the Pumping Test
Analysis of Pumping Test Data
Tidal Corrections
Well Loss
Step Drawdown Tests
Testing of Low‐yield Wells
Delayed Storage Release: Boulton Analysis
Pumping Tests
This chapter contains sections titled:
When a Pumping Test Is Advisable
Planning the Pumping Test
Design of the Pumping Well
Piezometer Array
Duration of Drawdown and Recovery
Pumping Rate
Monitoring the Pumping Test
Analysis of Pumping Test Data
Tidal Corrections
Well Loss
Step Drawdown Tests
Testing of Low‐yield Wells
Delayed Storage Release: Boulton Analysis
Pumping Tests
Powers, J. Patrick (author) / Corwin, Arthur B. (author) / Schmall, Paul C. (author) / Kaeck, Walter E. (author)
2007-04-04
20 pages
Article/Chapter (Book)
Electronic Resource
English
Slow drainage in pumping tests
Online Contents | 1994
Saint Emilion pumping station model tests
British Library Conference Proceedings | 1994
|Performance tests of large pumping plants
Engineering Index Backfile | 1941
|Monitoring of pumping tests and grouting operations
Springer Verlag | 1984
|Monitoring of pumping tests and grouting operations
Online Contents | 1984
|