A platform for research: civil engineering, architecture and urbanism
Multiple Level Outlet Works for Del Valle Reservoir
In 1963, it was decided to develop a basis for the design of multiple level outlet works for the Del Valle Dam and Reservoir Project along the route of the South Bay Aqueduct. The California Department of Water Resources initiated a study to determine the costs and benefits of such an operation. This paper presents background material, the results of the study and information on the current construction status of the Del Valle Project.
Multiple Level Outlet Works for Del Valle Reservoir
In 1963, it was decided to develop a basis for the design of multiple level outlet works for the Del Valle Dam and Reservoir Project along the route of the South Bay Aqueduct. The California Department of Water Resources initiated a study to determine the costs and benefits of such an operation. This paper presents background material, the results of the study and information on the current construction status of the Del Valle Project.
Multiple Level Outlet Works for Del Valle Reservoir
Drown, R. D. (author) / McCullough, C. A. (author)
Journal ‐ American Water Works Association ; 59 ; 566-574
1967-05-01
9 pages
Article (Journal)
Electronic Resource
English
Design , Costs , Aqueducts , California , Construction , Water Resources , Reservoirs
Earthen reservoir embankments and outlet works
Engineering Index Backfile | 1934
|Bouquet canyon reservoir and outlet works
Engineering Index Backfile | 1933
Reservoir outlet works for water supply
British Library Online Contents | 2000
|Earthen reservoir embankments and outlet works
Engineering Index Backfile | 1934
|The freezing of a reservoir outlet works
Engineering Index Backfile | 1919
|