A platform for research: civil engineering, architecture and urbanism
Diagnostics of prestressed ropes after multiannual operation – Bridge SNP Bratislava
Bridges, as public structures, are national infrastructure structures. The investment requirements and demands for safe operation should put them at the forefront of engineers' attention. The important SNP bridge in Bratislava (Slovakia), which is one of the first bridges in the world to be suspended entirely on cables, has been the subject of a diagnosis of its health after 50 years of operation. The article describes and documents the individual steps of this diagnostics ‐ identification of the rope material, the status of the rope material and its current strength properties, and the experimentally and computationally determination of the forces in the individual ropes and their cables. The uniqueness of all the diagnostic steps was that they were carried out directly in the outdoor conditions of full operation of the bridge. The achieved results are briefly documented in the paper. Conclusions and further necessary steps for the final comprehensive safety assessment of the bridge operation are formulated.
Diagnostics of prestressed ropes after multiannual operation – Bridge SNP Bratislava
Bridges, as public structures, are national infrastructure structures. The investment requirements and demands for safe operation should put them at the forefront of engineers' attention. The important SNP bridge in Bratislava (Slovakia), which is one of the first bridges in the world to be suspended entirely on cables, has been the subject of a diagnosis of its health after 50 years of operation. The article describes and documents the individual steps of this diagnostics ‐ identification of the rope material, the status of the rope material and its current strength properties, and the experimentally and computationally determination of the forces in the individual ropes and their cables. The uniqueness of all the diagnostic steps was that they were carried out directly in the outdoor conditions of full operation of the bridge. The achieved results are briefly documented in the paper. Conclusions and further necessary steps for the final comprehensive safety assessment of the bridge operation are formulated.
Diagnostics of prestressed ropes after multiannual operation – Bridge SNP Bratislava
Koščo, Tomáš (author) / Margetin, Matúš (author) / Chmelko, Vladimír (author)
ce/papers ; 7 ; 161-164
2024-09-01
4 pages
Article (Journal)
Electronic Resource
English
STRENGTHENING OF A REINFORCED CONCRETE BRIDGE WITH PRESTRESSED STEEL WIRE ROPES
DOAJ | 2017
|Deflection of prestressed concrete beams externally strengthened using Parafil ropes
Online Contents | 2003
|Continuous bridge girder prestressed in single operation
Engineering Index Backfile | 1953
|Engineering Index Backfile | 1957
|