A platform for research: civil engineering, architecture and urbanism
Estimating Costs for Treatment Plant Construction
Preliminary cost estimates can be used to compare the economics of various treatment processes or the costs of major project components. Such estimates do not, however, represent the actual construction and operation and maintenance costs of the project. Actual project costs are site‐specific, cannot be generalized, and must be developed for individual circumstances.
Estimating Costs for Treatment Plant Construction
Preliminary cost estimates can be used to compare the economics of various treatment processes or the costs of major project components. Such estimates do not, however, represent the actual construction and operation and maintenance costs of the project. Actual project costs are site‐specific, cannot be generalized, and must be developed for individual circumstances.
Estimating Costs for Treatment Plant Construction
Qasim, Syed R. (author) / Lim, Siang W. (Daniel) (author) / Motley, Edward M. (author) / Heung, Kim G. (author)
Journal ‐ American Water Works Association ; 84 ; 56-62
1992-08-01
7 pages
Article (Journal)
Electronic Resource
English
TIBKAT | 2004
|Engineering Index Backfile | 1916
|TIBKAT | 1953
|Engineering Index Backfile | 1953
TIBKAT | 1989
|