Small‐diameter tunneling in difficult ground – Analysis of TBM performance in hard rock
Small‐diameter tunneling in hard rock is increasingly widespread due to the need for new and longer utility tunnels comprising sewer, stormwater, freshwater, or hydropower as well as cable tunnels and casings for pipelines transporting gas or hydrogen. Utility tunnels have to deal with a wide range of geological settings, like small overburden, weathered rock, rock–soil transitions, as well as fractured or intact hard rock with high strength and abrasivity. A database has been created including 35 hard rock projects with diameters between 1 and 5 m as well as more than 70,000 m of tunnel alignments, with a median drive length of less than 500 m. Challenges in creating it and some early interpretations based on the contents of the database are presented. Details about an exemplary pipe jacking project in basement rocks in Brittany, France, are given. The large variety in this small‐diameter range in hard rock includes different TBM types, cutterhead designs, cutter types, and geotechnical conditions. Potential pitfalls in small‐diameter TBM data analysis are shown and general drive parameter trends and penetration prediction approaches are presented and set in relation to the geotechnical conditions. Our analysis shows that difficult ground conditions do not only incorporate rocks with very high strength, but also generally weak rocks like schist or limestone could be responsible for low penetration rates and high thrust forces.
Tunnelbau mit kleinem Durchmesser in schwierigem Untergrund – Analyse der TBM‐Leistung in hartem Fels
Die Anzahl an Tunnelbauprojekten mit kleinen Durchmessern in Gesteinen mit hohen Festigkeiten nimmt seit einigen Jahren stark zu, da neue und zunehmend längere Versorgungstunnel benötigt werden. Diese sogenannten Utility Tunnels sind mit einer Vielzahl von geologischen Gegebenheiten konfrontiert, wie geringe Überdeckung, starke Alteration der Gesteine, heterogene Ortsbrustbedingungen sowie Gesteine mit hoher Festigkeit und Abrasivität. Eine Datenbank mit zurzeit mehr als 35 Hartgesteinsprojekten mit Durchmessern zwischen 1 und 5 m sowie 70.000 m Tunneltrassen mit einer mittleren Projektlänge von weniger als 500 m wurde erstellt. Die Herausforderungen bei der Erstellung der Datenbank sowie einige erste Interpretationen auf der Grundlage des Inhalts der Datenbank werden vorgestellt. Weiterhin werden Details über ein beispielhaftes Rohrvortriebsprojekt im Grundgebirge der Bretagne, Frankreich, präsentiert. Die große Vielfalt in diesem kleinen Durchmesserbereich im Hartgestein umfasst unterschiedliche TBM‐Typen, Schneidkopfdesigns, Werkzeugtypen und geotechnische Bedingungen. Es werden mögliche Fallstricke bei der Analyse von TBM‐Daten aus Projekten mit kleinen Durchmessern aufgezeigt und allgemeine Trends bei den Antriebsparametern sowie Ansätze zur Vorhersage der Penetration vorgestellt und in Bezug zu den geotechnischen Bedingungen gesetzt. Unsere Analyse zeigt, dass schwierige Untergrundverhältnisse nicht nur Gesteine mit sehr hoher Festigkeit umfassen, sondern auch geringfeste Gesteine wie Schiefer oder Kalkstein für niedrige Vortriebsraten und hohe Anpresskräfte verantwortlich sein können.
Small‐diameter tunneling in difficult ground – Analysis of TBM performance in hard rock
Small‐diameter tunneling in hard rock is increasingly widespread due to the need for new and longer utility tunnels comprising sewer, stormwater, freshwater, or hydropower as well as cable tunnels and casings for pipelines transporting gas or hydrogen. Utility tunnels have to deal with a wide range of geological settings, like small overburden, weathered rock, rock–soil transitions, as well as fractured or intact hard rock with high strength and abrasivity. A database has been created including 35 hard rock projects with diameters between 1 and 5 m as well as more than 70,000 m of tunnel alignments, with a median drive length of less than 500 m. Challenges in creating it and some early interpretations based on the contents of the database are presented. Details about an exemplary pipe jacking project in basement rocks in Brittany, France, are given. The large variety in this small‐diameter range in hard rock includes different TBM types, cutterhead designs, cutter types, and geotechnical conditions. Potential pitfalls in small‐diameter TBM data analysis are shown and general drive parameter trends and penetration prediction approaches are presented and set in relation to the geotechnical conditions. Our analysis shows that difficult ground conditions do not only incorporate rocks with very high strength, but also generally weak rocks like schist or limestone could be responsible for low penetration rates and high thrust forces.
Tunnelbau mit kleinem Durchmesser in schwierigem Untergrund – Analyse der TBM‐Leistung in hartem Fels
Die Anzahl an Tunnelbauprojekten mit kleinen Durchmessern in Gesteinen mit hohen Festigkeiten nimmt seit einigen Jahren stark zu, da neue und zunehmend längere Versorgungstunnel benötigt werden. Diese sogenannten Utility Tunnels sind mit einer Vielzahl von geologischen Gegebenheiten konfrontiert, wie geringe Überdeckung, starke Alteration der Gesteine, heterogene Ortsbrustbedingungen sowie Gesteine mit hoher Festigkeit und Abrasivität. Eine Datenbank mit zurzeit mehr als 35 Hartgesteinsprojekten mit Durchmessern zwischen 1 und 5 m sowie 70.000 m Tunneltrassen mit einer mittleren Projektlänge von weniger als 500 m wurde erstellt. Die Herausforderungen bei der Erstellung der Datenbank sowie einige erste Interpretationen auf der Grundlage des Inhalts der Datenbank werden vorgestellt. Weiterhin werden Details über ein beispielhaftes Rohrvortriebsprojekt im Grundgebirge der Bretagne, Frankreich, präsentiert. Die große Vielfalt in diesem kleinen Durchmesserbereich im Hartgestein umfasst unterschiedliche TBM‐Typen, Schneidkopfdesigns, Werkzeugtypen und geotechnische Bedingungen. Es werden mögliche Fallstricke bei der Analyse von TBM‐Daten aus Projekten mit kleinen Durchmessern aufgezeigt und allgemeine Trends bei den Antriebsparametern sowie Ansätze zur Vorhersage der Penetration vorgestellt und in Bezug zu den geotechnischen Bedingungen gesetzt. Unsere Analyse zeigt, dass schwierige Untergrundverhältnisse nicht nur Gesteine mit sehr hoher Festigkeit umfassen, sondern auch geringfeste Gesteine wie Schiefer oder Kalkstein für niedrige Vortriebsraten und hohe Anpresskräfte verantwortlich sein können.
Small‐diameter tunneling in difficult ground – Analysis of TBM performance in hard rock
Lehmann, Gabriel (author) / Käsling, Heiko (author) / Praetorius, Steffen (author) / Seng, Frederic (author) / Thuro, Kurosch (author)
Geomechanics and Tunnelling ; 16 ; 15-21
2023-02-01
7 pages
Article (Journal)
Electronic Resource
German
Utility Tunneling , Rohrvortrieb , Fallstudie , Hartgestein , kleine Durchmesser , Maschineller Vortrieb , Neue Verfahren/Versuchstechnik , Geologie , Ingenieurgeologie utility tunneling , pipe jacking , case study , hard rock , small diameter , Mechanized tunneling , Innovative procedures/test techniques , Geology , Engineering geology
Performance prediction for small diameter hard-rock tunneling
British Library Conference Proceedings | 1999
|Performance prediction of hard rock Tunnel Boring Machines (TBMs) in difficult ground
British Library Online Contents | 2016
|Performance prediction of hard rock Tunnel Boring Machines (TBMs) in difficult ground
Online Contents | 2016
|Performance prediction of hard rock Tunnel Boring Machines (TBMs) in difficult ground
British Library Online Contents | 2016
|