A platform for research: civil engineering, architecture and urbanism
Survey of pressure management in water distribution systems
A survey was conducted to assess pressure management practices in water distribution systems. Most of the surveyed utilities agreed on the need to avoid low‐pressure episodes (< 20 psi). However, 56% of the utilities had no requirements for the maximum pressure delivered to customers, and 67% did not manage peak pressures in their systems. Only 13% of surveyed systems conducted pressure monitoring at critical locations—e.g., sites of highest or lowest pressure. Approximately 50% of systems reported at least one occurrence of negative pressure during the previous year; however, many more incidents of low and/or negative pressure may have gone undetected. The authors recommend that distribution system pressures be monitored in at least two locations in each pressure zone, representing the highest and lowest pressures. The recording interval could be set to 5–10 min with a 10‐s sampling interval. Impulse recording (when available) should be enabled to capture momentary pressure changes.
Survey of pressure management in water distribution systems
A survey was conducted to assess pressure management practices in water distribution systems. Most of the surveyed utilities agreed on the need to avoid low‐pressure episodes (< 20 psi). However, 56% of the utilities had no requirements for the maximum pressure delivered to customers, and 67% did not manage peak pressures in their systems. Only 13% of surveyed systems conducted pressure monitoring at critical locations—e.g., sites of highest or lowest pressure. Approximately 50% of systems reported at least one occurrence of negative pressure during the previous year; however, many more incidents of low and/or negative pressure may have gone undetected. The authors recommend that distribution system pressures be monitored in at least two locations in each pressure zone, representing the highest and lowest pressures. The recording interval could be set to 5–10 min with a 10‐s sampling interval. Impulse recording (when available) should be enabled to capture momentary pressure changes.
Survey of pressure management in water distribution systems
Xu, Minhua (author) / Yang, Jian (author) / Hughes, David M. (author) / Lechevallier, Mark W. (author)
Journal ‐ American Water Works Association ; 106 ; E518-E524
2014-11-01
7 pages
Article (Journal)
Electronic Resource
English
Survey of Pressure Management in Water Distribution Systems
British Library Conference Proceedings | 2011
|Combined Energy and Pressure Management in Water Distribution Systems
British Library Conference Proceedings | 2009
|Case studies in energy and pressure management in water distribution systems
British Library Conference Proceedings | 2007
|Pressure Management in Water Distribution Systems: Current Status, Proposals, and Future Trends
British Library Online Contents | 2016
|Estimation of the benefits yielded by pressure management in water distribution systems
British Library Online Contents | 2011
|