A platform for research: civil engineering, architecture and urbanism
Design and Operation of Recharge Basins Task Group Report
This report is the second in a series on the technical aspects of groundwater recharge. Topics covered include: general description; purposes; recharge water; geologic considerations; design details; Los Angeles County operations; construction; operation and maintenance; and, records.
Design and Operation of Recharge Basins Task Group Report
This report is the second in a series on the technical aspects of groundwater recharge. Topics covered include: general description; purposes; recharge water; geologic considerations; design details; Los Angeles County operations; construction; operation and maintenance; and, records.
Design and Operation of Recharge Basins Task Group Report
Journal ‐ American Water Works Association ; 55 ; 697-704
1963-06-01
8 pages
Article (Journal)
Electronic Resource
English
Optimum Operation of Recharge Basins
Online Contents | 1994
|Optimum Operation of Recharge Basins
British Library Online Contents | 1994
|Artificial Ground Water Recharge Task Group Report
Wiley | 1963
Purposes of Artificial Recharge: Task Group Report
Wiley | 1960
Removing Contaminants by Groundwater Recharge Basins
Wiley | 1986
|