Design and construction of the new railway bridge over the River Neckar – Challenges of the foundations
Planung und Bau der neuen Eisenbahnbrücke über den Neckar – Herausforderungen bei der Gründung
As part of the Stuttgart 21 infrastructure project, German Railways is building a four‐line railway bridge across the River Neckar in Stuttgart, work started in 2016.
The Neckar railway bridge has an overall length of 345 m and has two abutments and six support axes. The structure crosses rail lines from the urban transit (Stadtbahn), the main trunk road B 10, inner city roads, the Neckar River, pedestrian and cycle ways as well as diverse public and private utilities.
The bridge structure is located within the core mineral water protection zone, with its strict restrictions regarding the permissible depth of penetration into the subsoil and groundwater reservoirs. The mineral water springs lie within the construction site 26 m below the surface as artesian aquifers with an artesian pressure of ca. 10 m above ground level. From a groundwater management perspective, and following a program of five ground investigations and their evaluation, a raft foundation at the mid‐level of the lower Keuper, built using cut‐and‐cover technique with a compressed air caisson, was chosen as the most economical foundation type for the three primary supports.
A further programme of hydrochemical and geomechanical ground investigations was undertaken during the construction design phase. Following an evaluation of these additional ground parameters, it was possible to replace the compressed air caisson with a more economical deep foundation using large diameter piles. A management concept for possible scenarios was needed for the large diameter pile construction to achieve the required consent for exceptions from the ban on ground penetration in the area of the mineral springs.
Im Rahmen des Infrastrukturprojekts Stuttgart 21 errichtet die Deutsche Bahn in Stuttgart seit Anfang 2016 eine viergleisige Eisenbahnbrücke über den Neckar. Die Eisenbahnbrücke hat eine Gesamtlänge von ca. 345 m und führt über zwei Widerlager und sechs Pfeilerachsen.
Das Bauwerk überquert Stadtbahngleise, die Bundesstraße B 10, innerstädtische Straßen, den Neckar, Fuß‐ und Radwege sowie diverse Leitungen. Das Bauvorhaben liegt in der Kernzone des Stuttgarter Heilquellenschutzgebiets mit strengsten Auflagen hinsichtlich zulässiger Eingriffe in den Baugrund und Grundwasserhaltungen. Die Heilquellen liegen im Baufeld ca. 26 m unter Gelände als artesischer Grundwasserleiter mit einem Druckspiegel von rd. 10 m über Gelände vor.
Als schonendste Gründungsvariante der drei Hauptpfeiler hinsichtlich wasserwirtschaftlicher Aspekte wurde nach Auswertung der ersten fünf Baugrunderkundungsprogramme eine Flachgründung auf den Schichten des Unterkeupers mittels Druckluftgründung in Deckelbauweise angesehen. Im Zuge der Ausführungsplanung wurden die hydrochemischen und bodenmechanischen Eigenschaften des Baugrunds mit einem ergänzenden Erkundungsprogramm untersucht. Nach Auswertung aller zur Verfügung stehenden Erkundungsergebnisse konnte von einer Druckluftgründung auf eine wirtschaftlichere Tiefgründungsvariante mit Großbohrpfählen umgeplant werden. Um eine Genehmigung der erforderlichen Eingriffstiefen in der Kernzone des Heilquellenschutzgebiets zu erhalten, mussten im Vorfeld Handlungskonzepte für unterschiedliche Szenarien bei der Herstellung der Großbohrpfähle ausgearbeitet werden.
Design and construction of the new railway bridge over the River Neckar – Challenges of the foundations
Planung und Bau der neuen Eisenbahnbrücke über den Neckar – Herausforderungen bei der Gründung
As part of the Stuttgart 21 infrastructure project, German Railways is building a four‐line railway bridge across the River Neckar in Stuttgart, work started in 2016.
The Neckar railway bridge has an overall length of 345 m and has two abutments and six support axes. The structure crosses rail lines from the urban transit (Stadtbahn), the main trunk road B 10, inner city roads, the Neckar River, pedestrian and cycle ways as well as diverse public and private utilities.
The bridge structure is located within the core mineral water protection zone, with its strict restrictions regarding the permissible depth of penetration into the subsoil and groundwater reservoirs. The mineral water springs lie within the construction site 26 m below the surface as artesian aquifers with an artesian pressure of ca. 10 m above ground level. From a groundwater management perspective, and following a program of five ground investigations and their evaluation, a raft foundation at the mid‐level of the lower Keuper, built using cut‐and‐cover technique with a compressed air caisson, was chosen as the most economical foundation type for the three primary supports.
A further programme of hydrochemical and geomechanical ground investigations was undertaken during the construction design phase. Following an evaluation of these additional ground parameters, it was possible to replace the compressed air caisson with a more economical deep foundation using large diameter piles. A management concept for possible scenarios was needed for the large diameter pile construction to achieve the required consent for exceptions from the ban on ground penetration in the area of the mineral springs.
Im Rahmen des Infrastrukturprojekts Stuttgart 21 errichtet die Deutsche Bahn in Stuttgart seit Anfang 2016 eine viergleisige Eisenbahnbrücke über den Neckar. Die Eisenbahnbrücke hat eine Gesamtlänge von ca. 345 m und führt über zwei Widerlager und sechs Pfeilerachsen.
Das Bauwerk überquert Stadtbahngleise, die Bundesstraße B 10, innerstädtische Straßen, den Neckar, Fuß‐ und Radwege sowie diverse Leitungen. Das Bauvorhaben liegt in der Kernzone des Stuttgarter Heilquellenschutzgebiets mit strengsten Auflagen hinsichtlich zulässiger Eingriffe in den Baugrund und Grundwasserhaltungen. Die Heilquellen liegen im Baufeld ca. 26 m unter Gelände als artesischer Grundwasserleiter mit einem Druckspiegel von rd. 10 m über Gelände vor.
Als schonendste Gründungsvariante der drei Hauptpfeiler hinsichtlich wasserwirtschaftlicher Aspekte wurde nach Auswertung der ersten fünf Baugrunderkundungsprogramme eine Flachgründung auf den Schichten des Unterkeupers mittels Druckluftgründung in Deckelbauweise angesehen. Im Zuge der Ausführungsplanung wurden die hydrochemischen und bodenmechanischen Eigenschaften des Baugrunds mit einem ergänzenden Erkundungsprogramm untersucht. Nach Auswertung aller zur Verfügung stehenden Erkundungsergebnisse konnte von einer Druckluftgründung auf eine wirtschaftlichere Tiefgründungsvariante mit Großbohrpfählen umgeplant werden. Um eine Genehmigung der erforderlichen Eingriffstiefen in der Kernzone des Heilquellenschutzgebiets zu erhalten, mussten im Vorfeld Handlungskonzepte für unterschiedliche Szenarien bei der Herstellung der Großbohrpfähle ausgearbeitet werden.
Design and construction of the new railway bridge over the River Neckar – Challenges of the foundations
Planung und Bau der neuen Eisenbahnbrücke über den Neckar – Herausforderungen bei der Gründung
Zimmerer, Martin (author) / Wenger, Philipp (author) / Lienhart, Christoph (author) / Heer, Sebastian (author)
Geomechanics and Tunnelling ; 10 ; 177-192
2017-04-01
16 pages
Article (Journal)
Electronic Resource
English
The Tubingen railway bridge over the Neckar
Engineering Index Backfile | 1911
|The new railway bridge over the Neckar at Heidelberg
Engineering Index Backfile | 1907
|Construction of bridge over neckar at ilvesheim
Engineering Index Backfile | 1927
|Kurpfelz bridge over Neckar river in Mannheim, Germany
Engineering Index Backfile | 1952
|Hinged concrete arch bridge over the neckar River at Kirchheim, Wurtemberg
Engineering Index Backfile | 1900