Learning and optimization from the exploratory tunnel – Brenner Base Tunnel
Lernen und Optimieren vom Erkundungsstollen – Brenner Basistunnel
The Brenner Base Tunnel, which is 64 km long from the portal in Tulfes to the portal in Fortezza, consists of two main tunnels and a continuous exploratory tunnel. The exploratory tunnel, located between the two main tunnels, is used during the construction phase for the investigation of the rock mass, thereby reducing the risks of the construction of tunnels. During operation, the exploratory tunnel will serve as a drainage tunnel and will be fundamental for the maintenance of the entire system. At the moment, almost 50 % of the total distance of the exploratory tunnel length has already been completed. This paper first includes a report on the status of the works at the exploratory tunnel, with details of the stretches that have already been driven and the main results of exploration work. The paper also concerns ”Learning from the work on the exploratory tunnel“, with a description of the objectives and methods of exploration activities. ”Optimization“ is a further topic. Several examples are given here how the data gleaned from the exploratory tunnel are used in building the main tunnels.
Der Brenner Basistunnel mit einer Streckenlänge von 64 km vom Portal Tulfes bis zum Portal Franzensfeste besteht aus zwei Haupttunneln und einem durchgehenden Erkundungsstollen. Der Erkundungsstollen befindet sich mittig zwischen den beiden Haupttunneln, dient während der Bauphase der geologischen Detailerkundung des Gebirges und trägt damit zur Risikominimierung beim Bau der Haupttunnel bei. In der Betriebsphase dient der Erkundungsstollen als Entwässerungstollen und übernimmt eine wesentliche Funktion für die Instandhaltung des gesamten Tunnelsystems. Zum heutigen Stand sind bereits nahezu 50 % der gesamten Strecke des Erkundungsstollens ausgebrochen. Dieser Beitrag umfasst zunächst einen Überblick über den Stand der Arbeiten am Erkundungstollen. Dabei werden die bereits aufgefahrenen Abschnitte sowie die wesentlichen Erkundungsergebnisse vorgestellt. Anschließend befasst sich der Beitrag mit dem „Lernen aus dem Erkundungsstollen”. Es erfolgt eine Darstellung was und wie im Erkundungsstollen erkundet wird. Darauf folgend wird das „Optimieren” betrachtet. Hier werden einige spezifische Beispiele dargestellt, wie das im Erkundungsstollen Gelernte für die Haupttunnel umgesetzt wird.
Learning and optimization from the exploratory tunnel – Brenner Base Tunnel
Lernen und Optimieren vom Erkundungsstollen – Brenner Basistunnel
The Brenner Base Tunnel, which is 64 km long from the portal in Tulfes to the portal in Fortezza, consists of two main tunnels and a continuous exploratory tunnel. The exploratory tunnel, located between the two main tunnels, is used during the construction phase for the investigation of the rock mass, thereby reducing the risks of the construction of tunnels. During operation, the exploratory tunnel will serve as a drainage tunnel and will be fundamental for the maintenance of the entire system. At the moment, almost 50 % of the total distance of the exploratory tunnel length has already been completed. This paper first includes a report on the status of the works at the exploratory tunnel, with details of the stretches that have already been driven and the main results of exploration work. The paper also concerns ”Learning from the work on the exploratory tunnel“, with a description of the objectives and methods of exploration activities. ”Optimization“ is a further topic. Several examples are given here how the data gleaned from the exploratory tunnel are used in building the main tunnels.
Der Brenner Basistunnel mit einer Streckenlänge von 64 km vom Portal Tulfes bis zum Portal Franzensfeste besteht aus zwei Haupttunneln und einem durchgehenden Erkundungsstollen. Der Erkundungsstollen befindet sich mittig zwischen den beiden Haupttunneln, dient während der Bauphase der geologischen Detailerkundung des Gebirges und trägt damit zur Risikominimierung beim Bau der Haupttunnel bei. In der Betriebsphase dient der Erkundungsstollen als Entwässerungstollen und übernimmt eine wesentliche Funktion für die Instandhaltung des gesamten Tunnelsystems. Zum heutigen Stand sind bereits nahezu 50 % der gesamten Strecke des Erkundungsstollens ausgebrochen. Dieser Beitrag umfasst zunächst einen Überblick über den Stand der Arbeiten am Erkundungstollen. Dabei werden die bereits aufgefahrenen Abschnitte sowie die wesentlichen Erkundungsergebnisse vorgestellt. Anschließend befasst sich der Beitrag mit dem „Lernen aus dem Erkundungsstollen”. Es erfolgt eine Darstellung was und wie im Erkundungsstollen erkundet wird. Darauf folgend wird das „Optimieren” betrachtet. Hier werden einige spezifische Beispiele dargestellt, wie das im Erkundungsstollen Gelernte für die Haupttunnel umgesetzt wird.
Learning and optimization from the exploratory tunnel – Brenner Base Tunnel
Lernen und Optimieren vom Erkundungsstollen – Brenner Basistunnel
Bergmeister, Konrad (author) / Reinhold, Chris (author)
Geomechanics and Tunnelling ; 10 ; 467-476
2017-10-01
10 pages
Article (Journal)
Electronic Resource
English
Eisenbahntunnel , Erkundungsergebnisse , gelogischer Horizontalschnitt , Erkennen von Störungszonen , Felsmechanik , Maschinenparameter , Ausführung , Baugrunderkundung Rock mechanics , Construction works , exploratory results , Railway tunnels , detection of fault zones , TBM parameter , Reconnaissance , geological plan view
BRENNER BASE TUNNEL - Brenner push
Online Contents | 2011
British Library Online Contents | 2007
|Brenner Base Tunnel: Project status
British Library Online Contents | 2011
|Brenner Base Tunnel and Access Routes
British Library Online Contents | 2008
The Brenner Base Tunnel: A Project Resume
British Library Conference Proceedings | 1995
|