Risk Modeling of Dependence among Project Task Durations
Abstract: Project risk management requires assessments of project duration and activity criticality. The assessments, however, can be strongly influenced by the dependence between task durations. In light of the need to address the dependence, the present study proposes a computer simulation model to incorporate and augment NORTA, a method for multivariate random number generation. The proposed model allows arbitrarily specified marginal distributions for task durations (need not be members of the same distribution family) and any desired correlation structure. This level of flexibility is of great practical value when systematic data is not available and planners have to rely on experts' subjective estimation. The application of the proposed model is demonstrated through scheduling a road pavement project. The proposed model is validated by showing that the sample correlation coefficients between task durations closely match the originally specified ones. Empirical comparisons between the proposed model and two conventional approaches, PERT and conventional simulation (without correlations), are used to illustrate the usefulness of the proposed model.
Risk Modeling of Dependence among Project Task Durations
Abstract: Project risk management requires assessments of project duration and activity criticality. The assessments, however, can be strongly influenced by the dependence between task durations. In light of the need to address the dependence, the present study proposes a computer simulation model to incorporate and augment NORTA, a method for multivariate random number generation. The proposed model allows arbitrarily specified marginal distributions for task durations (need not be members of the same distribution family) and any desired correlation structure. This level of flexibility is of great practical value when systematic data is not available and planners have to rely on experts' subjective estimation. The application of the proposed model is demonstrated through scheduling a road pavement project. The proposed model is validated by showing that the sample correlation coefficients between task durations closely match the originally specified ones. Empirical comparisons between the proposed model and two conventional approaches, PERT and conventional simulation (without correlations), are used to illustrate the usefulness of the proposed model.
Risk Modeling of Dependence among Project Task Durations
Yang, I‐Tung (author)
Computer‐Aided Civil and Infrastructure Engineering ; 22 ; 419-429
2007-08-01
11 pages
Article (Journal)
Electronic Resource
English
Risk Modeling of Dependence among Project Task Durations
Wiley | 2007
|Risk Modeling of Dependence among Project Task Durations
Online Contents | 2007
|Approximate Risk Function for Project Durations
Springer Verlag | 2019
|Application of Time Buffers to Construction Project Task Durations
British Library Online Contents | 2013
|