Preview: Geomechanics and Tunnelling 5/2011
Proceedings of the 60th Geomechanics Colloquium
Benefits of geotechnical measurements
W. Schubert & B. Moritz: State of the art in evaluation and interpretation of displacement monitoring data in tunnels
H. Walter & C. Kitzler: Duration and continuity of monitoring: wishful thinking and reality
G. Barla & M. Alessio: Thorough geotechnical monitoring of a subway tunnel in service below rail link under construction in Torino
U. Maidl, M. Köhler & K. Schretter: Application of the observational method in TBM tunnelling
M. Müllegger, G. Lenz & H. Laimer: Geotechnical monitoring as key safety management element at the Dürnstein/Wachau rock slide
T. Pilgerstorfer, B. Moritz & A. Goricki: Assembling data from different sources to a coherent model: evaluation and interpretation of monitoring data from the instrumentation adit Paierdorf Accidents, lessons learned and their prevention
A. Maier: Lessons learned from mine collaps Lassing?
R. Poisel, R. Hofmann, A. Preh, T. Sausgruber & M. Schiffer: Lessons learned from Gschliefgraben mudslide (Austria)
J. Hartley & R. Bashir: Shaft sinking experience in the Athabasca Basin and geoscientific investigations for future shafts
J. Golser & E. Button: Experience in tunnelling in the Himalaya
B. Moritz, J. Koinig & G.‐M. Vavrovsky: Geotechnical safety management during tunnelling – An efficient approach for minimising risk Criteria for the selection of construction
M. Flora, W. Puprer & K. Bergmeister: Characteristics and potential for innovation of the tunnelling methods NATM, ADECO‐RS and TBM
D. Bach, R. Hödl, J. Lemmerer & A. Vig: Risk analysis for the selection of the adequate tunnelling method for the Pummersdorf Tunnel
M. Spiegl & E. Schneider: Selection of tunnelling method by use of examples
H. Ehrbar, A. Sala & R. Wick: Criteria for the selection of tunnelling methods at the Gotthard Base Tunnel
M. John & G. Pilser: Criteria for selecting a tunnelling method using the first and second tube of the Pfänder Tunnel as example
H. Wagner, G. Zwittnig, J. Daller & A. Fasching: Series of tunnels in Granitztal: Decision‐making process on tunnelling method
Z. Ekici, C. Rüegg, N. Salcher, O. Wagner & J. Weigl: Selection of the Tunnelling method for the new Semmering Base Tunnel Current large projects
M. Freitag, M. Larcher & A. Hager: The hydro power plant project HPP Reißeck II
B. Tauch, M. Reith & D. Handke: Shield tunnelling at the border area of experience
N. Reichard, J. Voringer & M. Rappold: Ortsumfahrung Hausmannstätten Tunnel Himmelreich – From exploration tunnel to completion of main tunnel
M. Brunnerm & E. Enengl: Difficulties facing near‐surface tunnelling in creeping soil
M. Weh & F. Bertholet: TBM‐advance in the main adit to the Nant de Drance pumped storage power plant
C. Dulake: Crossrail – Design and construction
Preview: Geomechanics and Tunnelling 5/2011
Proceedings of the 60th Geomechanics Colloquium
Benefits of geotechnical measurements
W. Schubert & B. Moritz: State of the art in evaluation and interpretation of displacement monitoring data in tunnels
H. Walter & C. Kitzler: Duration and continuity of monitoring: wishful thinking and reality
G. Barla & M. Alessio: Thorough geotechnical monitoring of a subway tunnel in service below rail link under construction in Torino
U. Maidl, M. Köhler & K. Schretter: Application of the observational method in TBM tunnelling
M. Müllegger, G. Lenz & H. Laimer: Geotechnical monitoring as key safety management element at the Dürnstein/Wachau rock slide
T. Pilgerstorfer, B. Moritz & A. Goricki: Assembling data from different sources to a coherent model: evaluation and interpretation of monitoring data from the instrumentation adit Paierdorf Accidents, lessons learned and their prevention
A. Maier: Lessons learned from mine collaps Lassing?
R. Poisel, R. Hofmann, A. Preh, T. Sausgruber & M. Schiffer: Lessons learned from Gschliefgraben mudslide (Austria)
J. Hartley & R. Bashir: Shaft sinking experience in the Athabasca Basin and geoscientific investigations for future shafts
J. Golser & E. Button: Experience in tunnelling in the Himalaya
B. Moritz, J. Koinig & G.‐M. Vavrovsky: Geotechnical safety management during tunnelling – An efficient approach for minimising risk Criteria for the selection of construction
M. Flora, W. Puprer & K. Bergmeister: Characteristics and potential for innovation of the tunnelling methods NATM, ADECO‐RS and TBM
D. Bach, R. Hödl, J. Lemmerer & A. Vig: Risk analysis for the selection of the adequate tunnelling method for the Pummersdorf Tunnel
M. Spiegl & E. Schneider: Selection of tunnelling method by use of examples
H. Ehrbar, A. Sala & R. Wick: Criteria for the selection of tunnelling methods at the Gotthard Base Tunnel
M. John & G. Pilser: Criteria for selecting a tunnelling method using the first and second tube of the Pfänder Tunnel as example
H. Wagner, G. Zwittnig, J. Daller & A. Fasching: Series of tunnels in Granitztal: Decision‐making process on tunnelling method
Z. Ekici, C. Rüegg, N. Salcher, O. Wagner & J. Weigl: Selection of the Tunnelling method for the new Semmering Base Tunnel Current large projects
M. Freitag, M. Larcher & A. Hager: The hydro power plant project HPP Reißeck II
B. Tauch, M. Reith & D. Handke: Shield tunnelling at the border area of experience
N. Reichard, J. Voringer & M. Rappold: Ortsumfahrung Hausmannstätten Tunnel Himmelreich – From exploration tunnel to completion of main tunnel
M. Brunnerm & E. Enengl: Difficulties facing near‐surface tunnelling in creeping soil
M. Weh & F. Bertholet: TBM‐advance in the main adit to the Nant de Drance pumped storage power plant
C. Dulake: Crossrail – Design and construction
Preview: Geomechanics and Tunnelling 5/2011
2011-08-01
1 pages
Article (Journal)
Electronic Resource
English
Preview: Geomechanics and Tunnelling 6/2011
Wiley | 2011
Preview: Geomechanics and Tunnelling 2/2011
Wiley | 2011
Preview: Geomechanics and Tunnelling 4/2011
Wiley | 2011
Preview: Geomechanics and Tunnelling 1/2011
Wiley | 2010
Preview: Geomechanics and Tunnelling 6/2014
Wiley | 2014