Earthquake lessons pay off in Sounthern California
Superior design standards, long‐term planning and preparation, and the development of in‐house repair capabilities helped MWDSC crews manage when the 1994 Northridge earthquake struck.
After the Sylmar earthquake in 1971, the Metropolitan Water District of Southern California established emergency planningprocedures. In 1994, the Northridge earthquake in the same area put those preparations to the test. Much of the groundwork proved helpful: an Emergency Operations Center was activated within 40 minutes, and reconnaissance patrols completed their damage inspection within just 5 hours. In addition, a decision to buy heavy machining equipment paid off when crews were able to fabricate new pipe sections for the damaged Jensen Filtration Plant. Lessons learned in 1994 were that practice sessions do not duplicate the actual experience of an earthquake; human emotional response to disaster is unpredictable; agencies can expect outside assistance and do not need large stockpiles of extra equipment; and a business resumption plan needs to be established so office work can continue during an emergency.
Earthquake lessons pay off in Sounthern California
Superior design standards, long‐term planning and preparation, and the development of in‐house repair capabilities helped MWDSC crews manage when the 1994 Northridge earthquake struck.
After the Sylmar earthquake in 1971, the Metropolitan Water District of Southern California established emergency planningprocedures. In 1994, the Northridge earthquake in the same area put those preparations to the test. Much of the groundwork proved helpful: an Emergency Operations Center was activated within 40 minutes, and reconnaissance patrols completed their damage inspection within just 5 hours. In addition, a decision to buy heavy machining equipment paid off when crews were able to fabricate new pipe sections for the damaged Jensen Filtration Plant. Lessons learned in 1994 were that practice sessions do not duplicate the actual experience of an earthquake; human emotional response to disaster is unpredictable; agencies can expect outside assistance and do not need large stockpiles of extra equipment; and a business resumption plan needs to be established so office work can continue during an emergency.
Earthquake lessons pay off in Sounthern California
Young, Michael B. (author) / III, Edward G. Means (author)
Journal ‐ American Water Works Association ; 87 ; 59-64
1995-05-01
6 pages
Article (Journal)
Electronic Resource
English
Lessons Learned from the 1994 Northridge, California Earthquake
British Library Online Contents | 1994
|Earthquake Damage Lessons from Big Bear Lake, California, 1992
Online Contents | 1993
|Earthquake Damage Lessons from Big Bear Lake, California, 1992. Robin Shepherd
Online Contents | 1995
|British Library Online Contents | 2008
Outlook: Earthquake design lessons
Online Contents | 1995