Brenner railway construction in the Lower Inn Valley
The Brenner Railway Company is currently constructing about 40 km of new line between Kundl/Radfeld and Baumkirchen in the Lower Inn valley in Austria. Almost 32 km of this route will run in tunnels, troughs, box‐section cut‐and‐cover and in a gallery. The route will have to cross the motorway, existing railways and the River Inn many times. The basic structure of more than 29 km of two‐track rail tunnel for the new railway line has already been completed. Track installation in the flatlands of the Tyrol is also on schedule and the new line will be open for traffic in 2012. Issue 6/09 reports on interesting tasks, problems encountered and particular features of the construction of the Lower Inn railway (Photo: ÖBB/Bstieler).
Zwischen Kundl/Radfeld und Baumkirchen errichtet die Brenner Eisenbahn Gesellschaft rund 40 km Neubautrasse. Fast 32 Kilometer dieser Anlage befinden sich in Tunneln, Wannen, Unterflurtrassen und in einer Galerie. Mehrmals ist die Querung der Autobahn, der bestehenden Eisenbahn sowie des Inns erforderlich. Mehr als 29 km zweigleisige Eisenbahntunnel für die neue Unterinntalbahn sind mittlerweile im Rohbau fertig gestellt. Der Schienenausbau im Tiroler Unterland liegt im Zeitplan, die neue Bahnstrecke wird 2012 in Betrieb gehen. Das Heft 6/09 berichtet über interessante Aufgaben, Fragestellungen und Besonderheiten beim Bau der Unterinntalbahn. (Foto: ÖBB/Bstieler).
Brenner railway construction in the Lower Inn Valley
The Brenner Railway Company is currently constructing about 40 km of new line between Kundl/Radfeld and Baumkirchen in the Lower Inn valley in Austria. Almost 32 km of this route will run in tunnels, troughs, box‐section cut‐and‐cover and in a gallery. The route will have to cross the motorway, existing railways and the River Inn many times. The basic structure of more than 29 km of two‐track rail tunnel for the new railway line has already been completed. Track installation in the flatlands of the Tyrol is also on schedule and the new line will be open for traffic in 2012. Issue 6/09 reports on interesting tasks, problems encountered and particular features of the construction of the Lower Inn railway (Photo: ÖBB/Bstieler).
Zwischen Kundl/Radfeld und Baumkirchen errichtet die Brenner Eisenbahn Gesellschaft rund 40 km Neubautrasse. Fast 32 Kilometer dieser Anlage befinden sich in Tunneln, Wannen, Unterflurtrassen und in einer Galerie. Mehrmals ist die Querung der Autobahn, der bestehenden Eisenbahn sowie des Inns erforderlich. Mehr als 29 km zweigleisige Eisenbahntunnel für die neue Unterinntalbahn sind mittlerweile im Rohbau fertig gestellt. Der Schienenausbau im Tiroler Unterland liegt im Zeitplan, die neue Bahnstrecke wird 2012 in Betrieb gehen. Das Heft 6/09 berichtet über interessante Aufgaben, Fragestellungen und Besonderheiten beim Bau der Unterinntalbahn. (Foto: ÖBB/Bstieler).
Brenner railway construction in the Lower Inn Valley
2009-12-01
1 pages
Article (Journal)
Electronic Resource
English
Budget and Forecast Costs for the Brenner Axis in the Lower Inn Valley/A
British Library Online Contents | 2008
|New Lower Inn Valley Railway: Railway Tunnel Munster-Wiesing/A
British Library Online Contents | 2008
|Online Contents | 1993