A platform for research: civil engineering, architecture and urbanism
Design of the GAC Treatment Facility at Cincinnati
The world's largest installation of granular activated carbon to treat drinking water is scheduled to be put in operation by the city of Cincinnati, Ohio, in 1988. After five years of pilot studies, details of the design of the facility, including components for on‐site regeneration of the carbon, have been developed. Twelve GAC contactors will provide an empty bed contact time of 15 minutes at a flow rate of 175 mgd (662 ML/d). The use of GAC is expected to remove the low concentrations of organic chemicals that are always present in the Ohio River, the city's water source.
Design of the GAC Treatment Facility at Cincinnati
The world's largest installation of granular activated carbon to treat drinking water is scheduled to be put in operation by the city of Cincinnati, Ohio, in 1988. After five years of pilot studies, details of the design of the facility, including components for on‐site regeneration of the carbon, have been developed. Twelve GAC contactors will provide an empty bed contact time of 15 minutes at a flow rate of 175 mgd (662 ML/d). The use of GAC is expected to remove the low concentrations of organic chemicals that are always present in the Ohio River, the city's water source.
Design of the GAC Treatment Facility at Cincinnati
Westerhoff, Garret P. (author) / Miller, Richard (author)
Journal ‐ American Water Works Association ; 78 ; 146-155
1986-04-01
10 pages
Article (Journal)
Electronic Resource
English
GAC-The Cincinnati Experience: Facility Design Considerations and Project Costs
British Library Conference Proceedings | 1994
|Greater Cincinnati Long-term CSO Facility Plan
British Library Conference Proceedings | 1996
|DELIRIOUS CINCINNATI Zaha Hadid shakes up downtown Cincinnati
British Library Online Contents | 2003
|DELIRIOUS CINCINNATI - Zaha Hadid shakes up downtown Cincinnati.
Online Contents | 2003
|Wiley | 1976
|