A platform for research: civil engineering, architecture and urbanism
Expansion of Kirchbichl Power Plant in Tyrol – Challenges of foundation engineeringErweiterung Kraftwerk Kirchbichl in Tirol – Herausforderungen an den Spezialtiefbau
Tiwag – Tiroler Wasserkraft AG sees itself as a driving force in the energy transition, pursuing the goals of the Tyrolean and Austrian energy strategies with a moderate, environment friendly expansion of hydropower. The projects are essentially aimed at expanding existing power plants so that they can be used more effectively, and additional hydropower potential can be developed. The Kirchbichl Power Plant is a good case in point. From 2017 to 2020, the power plant was made fit for the next decades as part of an extensive refurbishment and expansion project. The main project components are to improve flood security through the construction of an additional weir field, to adapt to enhanced environmental standards through the construction of a fish passage and a power plant for residual flow, and to increase the discharge of the power plant by installing an additional turbine. One of the challenges was the construction pits in the immediate vicinity of the existing system. The pit design with bored pile retaining wall and base seal with a jet grout slab has proven to be very effective.
Die Tiwag – Tiroler Wasserkraft AG versteht sich als treibende Kraft der Energiewende und verfolgt mit einem maßvollen und naturverträglichen Ausbau der Wasserkraft die Ziele der Tiroler und Österreichischen Energiestrategie. Die Ausbauvorhaben zielen dabei im Wesentlichen auf die Erweiterung und den Ausbau bestehender Kraftwerksanlagen. Somit können bestehende Kraftwerke besser genutzt und zusätzliches Wasserkraftpotenzial erschlossen werden. Besonders deutlich wird dies am Beispiel des Kraftwerks Kirchbichl. Von 2017 bis 2020 wurde die Kraftwerksanlage in einem umfangreichen Sanierung‐ und Erweiterungsprojekt für die nächsten Jahrzehnte fit gemacht. Wesentliche Projektbestandteile sind die Verbesserung der Hochwassersicherheit durch den Neubau eines zusätzlichen Wehrfelds (Entlastungsbauwerk), die Anpassung an den ökologischen Standard mit der Errichtung einer Fischwanderhilfe und eines Dotierkraftwerks sowie die Erhöhung der Ausbauwassermenge mit dem Zubau eines zusätzlichen Maschinensatzes. Eine der Herausforderungen dieser Gewerke waren die Baugruben in unmittelbarer Nachbarschaft zur Bestandsanlage. Die Baugrubenumschließung aus Bohrpfählen und die Sohlabdichtung mit einer DSV‐Sohle haben sich hierfür bestens bewährt.
Expansion of Kirchbichl Power Plant in Tyrol – Challenges of foundation engineeringErweiterung Kraftwerk Kirchbichl in Tirol – Herausforderungen an den Spezialtiefbau
Tiwag – Tiroler Wasserkraft AG sees itself as a driving force in the energy transition, pursuing the goals of the Tyrolean and Austrian energy strategies with a moderate, environment friendly expansion of hydropower. The projects are essentially aimed at expanding existing power plants so that they can be used more effectively, and additional hydropower potential can be developed. The Kirchbichl Power Plant is a good case in point. From 2017 to 2020, the power plant was made fit for the next decades as part of an extensive refurbishment and expansion project. The main project components are to improve flood security through the construction of an additional weir field, to adapt to enhanced environmental standards through the construction of a fish passage and a power plant for residual flow, and to increase the discharge of the power plant by installing an additional turbine. One of the challenges was the construction pits in the immediate vicinity of the existing system. The pit design with bored pile retaining wall and base seal with a jet grout slab has proven to be very effective.
Die Tiwag – Tiroler Wasserkraft AG versteht sich als treibende Kraft der Energiewende und verfolgt mit einem maßvollen und naturverträglichen Ausbau der Wasserkraft die Ziele der Tiroler und Österreichischen Energiestrategie. Die Ausbauvorhaben zielen dabei im Wesentlichen auf die Erweiterung und den Ausbau bestehender Kraftwerksanlagen. Somit können bestehende Kraftwerke besser genutzt und zusätzliches Wasserkraftpotenzial erschlossen werden. Besonders deutlich wird dies am Beispiel des Kraftwerks Kirchbichl. Von 2017 bis 2020 wurde die Kraftwerksanlage in einem umfangreichen Sanierung‐ und Erweiterungsprojekt für die nächsten Jahrzehnte fit gemacht. Wesentliche Projektbestandteile sind die Verbesserung der Hochwassersicherheit durch den Neubau eines zusätzlichen Wehrfelds (Entlastungsbauwerk), die Anpassung an den ökologischen Standard mit der Errichtung einer Fischwanderhilfe und eines Dotierkraftwerks sowie die Erhöhung der Ausbauwassermenge mit dem Zubau eines zusätzlichen Maschinensatzes. Eine der Herausforderungen dieser Gewerke waren die Baugruben in unmittelbarer Nachbarschaft zur Bestandsanlage. Die Baugrubenumschließung aus Bohrpfählen und die Sohlabdichtung mit einer DSV‐Sohle haben sich hierfür bestens bewährt.
Expansion of Kirchbichl Power Plant in Tyrol – Challenges of foundation engineeringErweiterung Kraftwerk Kirchbichl in Tirol – Herausforderungen an den Spezialtiefbau
Hautz, Werner (author) / Neuner, Johann (author)
Geomechanics and Tunnelling ; 14 ; 175-183
2021-04-01
9 pages
Article (Journal)
Electronic Resource
German
British Library Online Contents | 1994
|Herausforderungen für die Spezialtiefbau-Forschung
HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2018
|