A platform for research: civil engineering, architecture and urbanism
Theme Introduction
Timing, political savvy, engineering judgment, financial expertise, and very careful preparation are but a few of the needs of water utility expansion and operation and their financing. The Safe Drinking Water Act requirements, rising operating costs, new filtration and treatment facilities, salary levels, and water rates are covered.
Theme Introduction
Timing, political savvy, engineering judgment, financial expertise, and very careful preparation are but a few of the needs of water utility expansion and operation and their financing. The Safe Drinking Water Act requirements, rising operating costs, new filtration and treatment facilities, salary levels, and water rates are covered.
Theme Introduction
Journal ‐ American Water Works Association ; 70 ; 237
1978-05-01
1 pages
Article (Journal)
Electronic Resource
English
Wiley | 1977
Wiley | 1978
Wiley | 1977
Wiley | 1978