A platform for research: civil engineering, architecture and urbanism
Retrofitting of the Slovene Ethnographic Museum
10.1002/bapi.200710045.abs
The paper presents the technological part of activities executed in the framework of MUSEUMS Project. Astonishingly good results are only the visible part of an iceberg. The working process reveals that the R&D part of the efforts was in our case positively oriented activity, while the real problems appeared on the side of performance of birocracy on all levels, engineering management, designers not being used to new approaches and companies involved in the construction works, especially installations. There were two main fields of interventions: construction with new envelope design, new heating‐cooling wall panels system, which replaced the originally designed air condition system, and ventilation which is used for physiological and cooling purposes, as well as control and management system taking care as much as possible harmonization of the demands regarding temperature, humidity and air quality level, upgraded with permanent monitoring system. The authors are obliged to stress that the success of such projects depends on extensive collaboration of all involved partners from the very beginning.
Sanierung des Slowenischen Ethnographischen Museums.
Dieser Artikel beschreibt den technischen Teil der im Rahmen des Museumsprojektes durchgeführten Maßnahmen. Bei den erstaunlich guten Ergebnissen handelt es sich sozusagen um die Spitze eines Eisberges. Der FuE‐Teil dieses Projektes erwies sich als sehr positiv, während es erhebliche Probleme im Zusammenhang mit Bürokratie, technischer Leitung, mangelnder Vertrautheit mit neuen Methoden und ausführenden Firmen gab. Die Sanierung umfasste im Wesentlichen zwei Bereiche: neue Gebäudehülle, neues Klimawandtafelsystem als Ersatz für die ursprünglich vorgesehene Klimaanlage, Lüftung für physiologische und Kühlzwecke, sowie ein Gebäudemanagementsystem zur automatischen Koordinierung der Anforderungen bezüglich Temperatur, Luftfeuchte und Luftqualität, in Verbindung mit einem permanenten Überwachungssystem. Es gilt zu betonen, dass der Erfolg solcher Projekte von der umfassenden Zusammenarbeit aller Beteiligten von Beginn an abhängt.
Retrofitting of the Slovene Ethnographic Museum
10.1002/bapi.200710045.abs
The paper presents the technological part of activities executed in the framework of MUSEUMS Project. Astonishingly good results are only the visible part of an iceberg. The working process reveals that the R&D part of the efforts was in our case positively oriented activity, while the real problems appeared on the side of performance of birocracy on all levels, engineering management, designers not being used to new approaches and companies involved in the construction works, especially installations. There were two main fields of interventions: construction with new envelope design, new heating‐cooling wall panels system, which replaced the originally designed air condition system, and ventilation which is used for physiological and cooling purposes, as well as control and management system taking care as much as possible harmonization of the demands regarding temperature, humidity and air quality level, upgraded with permanent monitoring system. The authors are obliged to stress that the success of such projects depends on extensive collaboration of all involved partners from the very beginning.
Sanierung des Slowenischen Ethnographischen Museums.
Dieser Artikel beschreibt den technischen Teil der im Rahmen des Museumsprojektes durchgeführten Maßnahmen. Bei den erstaunlich guten Ergebnissen handelt es sich sozusagen um die Spitze eines Eisberges. Der FuE‐Teil dieses Projektes erwies sich als sehr positiv, während es erhebliche Probleme im Zusammenhang mit Bürokratie, technischer Leitung, mangelnder Vertrautheit mit neuen Methoden und ausführenden Firmen gab. Die Sanierung umfasste im Wesentlichen zwei Bereiche: neue Gebäudehülle, neues Klimawandtafelsystem als Ersatz für die ursprünglich vorgesehene Klimaanlage, Lüftung für physiologische und Kühlzwecke, sowie ein Gebäudemanagementsystem zur automatischen Koordinierung der Anforderungen bezüglich Temperatur, Luftfeuchte und Luftqualität, in Verbindung mit einem permanenten Überwachungssystem. Es gilt zu betonen, dass der Erfolg solcher Projekte von der umfassenden Zusammenarbeit aller Beteiligten von Beginn an abhängt.
Retrofitting of the Slovene Ethnographic Museum
Krainer, Alesš (author) / Perdan, Rudi (author) / Krainer, Gal (author)
Bauphysik ; 29 ; 350-365
2007-10-01
16 pages
Article (Journal)
Electronic Resource
English
Retrofitting of the Slovene Ethnographic Museum
Online Contents | 2007
|Retrofitting of the Slovene Ethnographic Museum
British Library Online Contents | 2007
|01-147 Heating-cooling wall panels system in Slovene Ethnographic Museum - SEM
British Library Conference Proceedings | 2005
|Pedestrian Safety in Slovene Urban Areas
Springer Verlag | 2024
|La riqualificazione della memoria (Andrea Bruno) - Ethnographic Museum in Corsica
Online Contents | 1999
|